Trina Storage launches new BESS solution at Energy Storage Summit EU

LinkedIn
Twitter
Reddit
Facebook
Email

Trina Storage, the energy storage arm of major solar PV company Trina Solar, launched its new battery storage solution Elementa 2, to the global market at this year’s Energy Storage Summit EU.

The vertically integrated manufacturer’s new battery energy storage system (BESS) includes the company’s own 306Ah high energy density lithium iron phosphate (LFP) cell, enabling 4,073kWh nominal capacity in a standard 20-foot container.

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

As with the previous iteration of Elementa, which has been deployed in projects mainly in China and the UK, it is liquid-cooled and is compliant with international certifications, including UL1973 and UL9540A thermal runaway testing.

The company claimed Elementa 2 is highly integrated and flexible, to offer reduced Capex and Opex requirements over the lifetime of the system.

Fire safety components include fire resistant enclosure, and four levels of threat detection including a fire panel with heat and smoke sensors and integration of the Honeywell Li-ion Tamer gas detection technology, and an automatic aerosol-based fire suppression system as standard with an optional water-based suppression system which can also be added.

In an exclusive interview with Energy-Storage.news, to be published in the coming days via ESN Premium, Trina Solar executive president Helena Li said that of more than 4GWh of shipments of the first Elementa since its launch two years ago, the UK has accounted for around 1GWh, in other words the vast majority of installations outside China where the company is headquartered.

Having announced the first commissioned project for Elementa in East England at the Energy Storage Summit in 2022, it made sense to come back for this year’s edition with the new model’s global debut, Li said. It follows a preview late last year at All-Energy Australia.

Additionally, within the UK, Trina Storage has served as system integrator as well as technology provider on most of those projects. Working at that detailed level in one of the world’s leading markets meant Trina Storage picked up a lot of know-how and understanding of what customers want, Helena Li claimed.

This article has been amended from its original form to accurately reflect Helena Li’s role of executive president.

17 June 2025
Napa, USA
PV Tech has been running PV ModuleTech Conferences since 2017. PV ModuleTech USA, on 17-18 June 2025, will be our fourth PV ModulelTech conference dedicated to the U.S. utility scale solar sector. The event will gather the key stakeholders from solar developers, solar asset owners and investors, PV manufacturing, policy-making and and all interested downstream channels and third-party entities. The goal is simple: to map out the PV module supply channels to the U.S. out to 2026 and beyond.
1 July 2025
London, UK
UK Solar Summit 2025 will look at the role solar currently plays in the energy mix, how this will change over the coming years and how this aligns with net-zero and other government targets. We will break down all these challenges and help build up solutions through discursive panels, motivational keynotes and case studies, with newly added interactive sessions to get you moving and meeting your peers, making the connections you need to boost your business.

Read Next

Premium
May 21, 2025
ESN Premium speaks with Dr. Yinghuang Ji, head of structuring at MN8 Energy, on current challenges and opportunities for growth in the energy storage market.
May 21, 2025
Dr. Judy Jeevarajan of UL Research Institutes highlights essential steps to ensure that safer battery storage can be at the heart of the global energy transition.
May 20, 2025
Fluence has taken a step forward in its strategy to “fully onshore production, as quickly as possible,” opening a new factory in the US.
May 19, 2025
Elements Green has received grid connection approval from Powerlink Queensland and the AEMO for a 1.3GWh solar-plus-BESS site in Queensland.
May 16, 2025
In a contrasting double-header of news for the US energy storage ecosystem, Our Next Energy (ONE) has launched US-made cells, modules and BMS while BESS manufacturer American Energy Storage Innovations (AESI) is winding down its business.

Most Popular

Email Newsletter