Commercial operation has started on the 100MW/331MWh Bramley battery energy storage system (BESS), a project in the UK deployed by owner-operator BW ESS, developer Penso Power and BESS provider Sungrow.
Welbar Energy Storage joint venture – made up of Penso Power and Luminous Energy – has secured planning permission for a 350MW connection capacity battery storage development with a five-hour duration in the UK.
In mid-July, the 100MW / 100MWh Minety battery energy storage system (BESS) was completed in Wiltshire, southern England. Something of a landmark project for the UK and Europe’s battery storage industries, here’s what’s happened so far, as reported by our sister sites Current± and Solar Power Portal.