Australia-based battery energy storage system (BESS) developer, owner and operator Stor-Energy has announced plans to build a 1,449MWh 8-hour duration BESS.
CEA has recently released two battery energy storage system (BESS) reports for Q2 2025, the Energy Storage System Price Forecasting Report and the ESS Supply, Technology, and Policy Report.
Optimiser GridBeyond, over the summer, began operating the 200MW/400MWh Big Rock Battery Energy Storage System (BESS) in El Centro, California, with Gore Street Energy Storage Fund (GSF).
Three companies, Ultion Technologies, Ultium Cells and SK On have recently announced plans to begin manufacturing lithium iron phosphate (LFP) battery cells in the US.
Australian renewable energy developer Edify Energy has confirmed that the 185MW/370MWh Koorangie battery energy storage system (BESS) in Victoria is fully operational.