The Energy Storage Report 2024

Now available to download, covering deployments, technology, policy and finance in the energy storage market

Spain awards contracts to 1.9GWh energy storage in first PERTE tender

LinkedIn
Twitter
Reddit
Facebook
Email
ingeteam spain spanish
Spain is targeting 20GW of energy storage by 2030. This BESS was deployed by Ingeteam at a green hydrogen facility in Ciudad Real. Image: Ingeteam.

The government of Spain, through the Institution for the diversification and energy savings (IDAE) has awarded 880MW/1,809MWh in its first tender for energy storage to be co-located with renewables.

Among the companies awarded from the Spanish strategic projects for the economic recovery and transition (PERTE in Spanish) programme are utilities Iberdrola, Naturgy, Enel Green Power but also renewables developer Fotowatio Renewable Ventures (FRV) among others.

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

Results were published in mid-November with in total 34 projects awarded capacity in the auction across the entire territory, including one project each in the Canary Islands and Balearic Islands, however most of the capacity was focused in the central provinces of Spain, as shown in the map below.

The launch of this first tender aimed to co-locate energy storage with other renewable sources, mainly solar PV, and aimed to fund at least 600MW of projects with a fund of €150 million (US$162 million) in capital expenditure for the projects.

Grants will cover 40-65% of the project cost depending on the size of the company applying, while nearly €160 million ended up being allocated to the awarded projects.

All the projects but one are targeted to be completed in 2025, with the exception being one awarded in the Balearic Islands, expected to be completed by the end of April 2026. Spain targets 20GW of new energy storage by 2030.

The first tender ended up being oversubscribed with more than 1.1GW/1.1GWh capacity, between 58 projects, not selected for the funding of the tender.

The projects that were awarded in the PERTE tender were measured based on four criteria, with different points. Projects were awarded based on the total score across these four criteria which were: economic viability (35%), technical features (25%), project viability (10%) and externalities (30%).

According to a post on LinkedIn from Lars Stephan, senior manager of policy and market development at Fluence, Spain’s way of selecting winning projects was “quite different” to other support schemes seen in Europe in the past. “Taking technical criteria in sight will ensure that smartest instead of cheapest systems are going to be built; systems that will be able to provide future system needs such as inertia and other system stability services.”

Energy-Storage.news’ publisher Solar Media will host the 9th annual Energy Storage Summit EU in London, 20-21 February 2024. This year it is moving to a larger venue, bringing together Europe’s leading investors, policymakers, developers, utilities, energy buyers and service providers all in one place. Visit the official site for more info.

Read Next

May 20, 2024
Energy-Storage.news speaks with Danny Lu of Powin about some of the system integrator’s thoughts on the Australia market and delivery of the Waratah Super Battery.
Premium
May 16, 2024
UK electricity market operator National Grid ESO is reassessing how much energy storage gets paid in the Capacity Market, battery storage operators told Energy-Storage.news, with one calling the current system ‘outdated’.
May 16, 2024
France-headquartered independent power producer (IPP) Voltalia has started building a 126MW solar PV project in Uzbekistan, to which it will add a 50MW/100MWh BESS with plans to build another project ten times as big.
May 16, 2024
Infrastructure investor InfraVia has bought a majority stake in Giga Storage, a Netherlands-headquartered BESS developer which is building a 2.4GWh project in Belgium.
May 14, 2024
Utility DTE Energy has launched a request for proposals (RFP), seeking approximately 120MW of standalone energy storage projects in its Michigan, US, service area.

Most Popular

Email Newsletter