SolarEdge opens 2GWh lithium battery cell factory in South Korea

LinkedIn
Twitter
Reddit
Facebook
Email

Smart energy optimisation and management tech company SolarEdge has begun producing test cells for certification at its newly opened lithium-ion cell gigafactory in South Korea.

SolarEdge said the plant is a response to growing demand for battery energy storage and will have a 2GWh annual production capacity when it fully ramps during the second half of this year. The factory is named Sella 2, after SolarEdge’s late founder and former CEO Guy Sella.

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

The company acquired South Korean battery manufacturer and energy storage system (ESS) integrator Kokam in 2019. The Sella 2 plant has been built together with Kokam in Eumseong Innovation City, Chungcheongbuk-do Province.

A SolarEdge representative told Energy-Storage.news the factory will produce nickel manganese cobalt (NMC) pouch cells.

They will be primarily aimed at the “fast growing” residential ESS sector, with SolarEdge manufacturing its own SolarEdge Energy Bank Home Battery storage systems, the representative said,

However they will also be made for other applications including mobile energy storage and stationary energy storage systems that require “high power and high-reliability cells”. For example, Kokam was awarded a contract last year to deliver a 15MW/10.4MWh battery storage solution for a utility in Tahiti that will provide synchronous inertia to the local grid while increasing adoption of renewable energy.

“The new plant will utilise the battery cell technology developed by Kokam over the years to manufacture Li-Ion cells for the broader company products, and in order to grow the existing business served by the storage division,” the spokesperson said.

“The accumulated knowledge of Kokam in developing battery cells combined with the scale of the new factory will allow SolarEdge to adjust the cell chemistry and characteristics in order to optimise product cost and performance.”

Cells will be shipped to global markets, while the SolarEdge Home Battery system will then be assembled in Europe, while systems for other applications that are not PV-related will be assembled in Korea.

SolarEdge’s CEO Zvi Lando said that the opening of Sella 2 was an important milestone for the company which “allows us to own key processes in the development and manufacturing of advanced energy storage solutions for our solar core business and additional applications, while further securing the resilience of our supply chain”.

“We are committed to growing our business in the energy storage market, as well as our investment in battery cell technology and cell manufacturing, further strengthening our storage product portfolio,” Lando said.

SolarEdge became known for its power optimisers, particularly in the US residential market where it carved out a healthy market share, but has broadened its base to include EV charging solutions, various smart PV inverters, energy management systems (EMS) and other products.

17 June 2025
Napa, USA
PV Tech has been running PV ModuleTech Conferences since 2017. PV ModuleTech USA, on 17-18 June 2025, will be our fourth PV ModulelTech conference dedicated to the U.S. utility scale solar sector. The event will gather the key stakeholders from solar developers, solar asset owners and investors, PV manufacturing, policy-making and and all interested downstream channels and third-party entities. The goal is simple: to map out the PV module supply channels to the U.S. out to 2026 and beyond.
1 July 2025
London, UK
UK Solar Summit 2025 will look at the role solar currently plays in the energy mix, how this will change over the coming years and how this aligns with net-zero and other government targets. We will break down all these challenges and help build up solutions through discursive panels, motivational keynotes and case studies, with newly added interactive sessions to get you moving and meeting your peers, making the connections you need to boost your business.

Read Next

Premium
December 10, 2024
Investor-owned utility (IOU) Southern California Edison (SCE) is seeking regulatory approval of resource adequacy (RA) contracts covering 620MW of BESS capacity across three projects.
December 6, 2024
US renewable energy developer, Longroad Energy announced financial close of 111MWdc solar and 85MWac/340MWh storage project Sun Pond in Maricopa County, Arizona 4 December.
Premium
December 5, 2024
Clean energy loan and grant activity from the US Department of Energy (DOE) and its Loan Programs Office (LPO) has soared around the election of Donald Trump, analysis by Energy-Storage.news shows, with officials reportedly keen to get deals over the line before the new administration comes in.
Premium
December 5, 2024
Hawthorne Renewable Energy has commenced permitting for a 300MW solar project co-located with a 300MW/1,200MWh BESS in Grant County, Washington.
Premium
December 4, 2024
Dallas, Texas-based independent power producer (IPP) Stellar Renewable Power has secured a Special Use Permit (SUP) to construct and operate a 1GW/4GWh BESS project co-located with a 1GW solar farm in Navajo County, Arizona.

Most Popular

Email Newsletter