PODCAST: Batteries vs California’s heatwave woes, polysilicon pricing and solar, lithium-ion safety

August 24, 2020
LinkedIn
Twitter
Reddit
Facebook
Email

Liam Stoker and Andy Colthorpe return for the August 2020 episode of the Solar Media podcast, reflecting on the biggest news stories from the global solar and energy storage ecosystems.

Up for discussion this month are California’s ongoing heatwave and its impact on energy demand and storage, why looming volatility in the cost of polysilicon should be on everyone’s radar, and what we should be taking from the increasing costs of managing grids worldwide.

The podcast can be streamed below:

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Alternatively, you can subscribe and listen to the podcast on the Solar Media Editor’s Channel, which is now on all popular audio channels, including;

Apple Podcasts
Spotify
Google Podcasts

Read Next

January 23, 2026
Palmer Renewable Energy has submitted a referral under the EPBC Act for a 200MW solar-plus-storage project near Collie, Western Australia.
Premium
January 22, 2026
Saudi Arabia and the UAE have emerged as two of the world’s most prominent energy storage markets, with mega-scale projects announced and moved forward at a staggering pace over the last two years. But what does the next phase look like?
January 21, 2026
Amazon has been approved as the buyer of the 1.2GW Sunstone solar project in Oregon, one of the largest solar PV projects in the US.
Premium
January 19, 2026
US-based iron-sodium battery manufacturer Inlyte Energy has successfully completed a factory acceptance test of its first field-ready battery at its facility near Derby, UK, witnessed by representatives from US utility Southern Company.
January 19, 2026
FranklinWH and ConnectDER have had their respective battery and electric meter technologies enrolled into programmes in Arizona expected to accelerate the take-up of home batteries for virtual power plants (VPPs).