The US battery storage system integrator arm of Korean battery manufacturer LG Energy Solution (LG ES) has signed a 4-year supply deal with developer Terra-Gen.
Wärtsilä has carried out more large-scale fire tests on its battery storage units, which the system integrator claimed closely resemble real-life ‘worst-case scenario’ conditions.
Lithium-ion OEM LG Energy Solution will slow its expansion to focus on increasing utilisation at existing production lines, while also starting battery production in the US for energy storage next year, it revealed in its quarterly results.
Specialist renewable energy insurance company kWh Analytics considers thermal runaway to still be the single most important risk that energy storage system developers must consider.
Gore Street Energy Storage Fund will provide a Goldman Sachs subsidiary with power from its Big Rock BESS in California via a 12-year, fixed price Resource Adequacy (RA) contract.
KORE Power CEO Lindsay Gorrill speaks with ESN Premium about the US startup’s manufacturing plans, why NMC won’t go away anytime soon, and where he thinks the BESS market is going.