US PV installer Sunworks plumps for Sharp’s SmartStorage system

LinkedIn
Twitter
Reddit
Facebook
Email

Source: Flickr/Andy Armstrong.
US solar installer Sunworks has selected Sharp’s SmartStorage system as it expands its offering.

The company said storage was a chance to expand its offering.

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

"We are seeing the market move toward energy storage," said Jim Nelson, CEO of Sunworks. "This is an opportunity to grow our business and provide our customers with a reliable, high performing, and high quality storage solution that can deliver savings. We plan to deploy the SmartStorage system to all of our commercial projects where the economics make sense," said Nelson.

The Sharp system will be the primary but not exclusive storage product used by Sunworks.

Sunworks, which operates in California and Nevada, will assess all of its solar commercial building projects for suitability with storage. It said areas with peak demand charges of US$18/kW would be of particular focus.

The SmartStorage system includes predictive learning that reduces consumption of grid electricity when prices are highest.

Crucially, Sharp will also make its zero-down financing available to Sunworks. The Japanese manufacturer offers a 10-year guarantee on its energy storage systems.

Sunworks recently posted a dramatic drop in its installed capacity during Q3 2016 as a number of projects were pushed to Q4 and into 2017.

Read Next

July 7, 2025
Avantus has raised more than US$500 million for 200MW/500MWh Aratina 1 BESS project in Kern County, California.
July 4, 2025
Zinc hybrid cathode battery and storage system maker Eos Energy has received its second loan advance from the US Department of Energy’s (DOE’s) Loan Programs Office (LPO).
July 4, 2025
Gamuda has partnered with landowners for a 1.2GW renewable energy and energy storage portfolio in Tasmania, Australia, which includes up to 600MW of energy storage capacity.
July 3, 2025
In Texas, Vitis Energy announces financial close of the Apache Hill Energy Centre while Enertis Applus+ provides independent engineering services for Excelsior Energy Capital.
July 3, 2025
Idaho Power’s updated integrated resource plan adds more solar, wind and energy storage than gas generation, while Public Service Company of New Mexico gets 450MW of solar and storage added to its resource application.

Most Popular

Email Newsletter