UK’s Capacity Market becomes target for flow battery maker CellCube

February 12, 2019
LinkedIn
Twitter
Reddit
Facebook
Email
Image: CellCube.

Long duration flow battery manufacturer CellCube will bring its large-scale vanadium redox flow systems to the UK, with the country’s Capacity Market firmly in its sights, according to Immersa, which the Canadian energy storage company has signed up to partner with.

UK-based solutions provider Immersa is to offer the vanadium redox flow systems to its customers in the British market. Robert Miles, Immersa’s chief executive, pointed towards a market trend towards longer duration batteries as the two companies announced the strategic partnership.

“We have been active in the UK storage sector for nearly three years and have already seen an enormous change in the application of the technology and the revenues that are derived from them.

“We have designed systems that used multiple generation technology and by installing in combination with these long duration batteries, we have shown that it is both possible and commercially feasible to generate, store and consume power that has been self-produced,” he said.

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

Not ready to commit yet?
  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

A significant driver for longer-duration batteries in the UK market has been transmission system operator National Grid’s de-rating factors, applied to battery storage projects that bid for contracts in the Capacity Market.

As administrator of the mechanism, National Grid applies a de-rating factor based on the project’s duration, ranging from 30 minutes to four hours; the maximum expected length of a system stress event.

Batteries capable of discharging for the full four hours stand to receive the highest level of support under the mechanism, a factor which has led many developers – including Anesco – to explore the possibility of adopting longer duration, but higher cost, battery technologies like vanadium flow machines.

Flow machines have already been installed within several energy storage projects in the UK, with redT the early market leader. Last year water utility Anglian Water penned a deal with redT which will see it use flow machine-based energy storage units to optimise the solar generation at one of its facilities as part of a “pathfinder for future projects”.

Stefan Schauss, president at CellCube, said the Immersa deal strengthened the manufacturer’s strategy to target large scale energy storage infrastructure projects.

“The capacity driven markets in the UK with its many solar and wind farms is our next focus market to enable large storage infrastructure projects in their neighbourhood delivering high value streams to asset owners. Immersa and CellCube are inviting potential clients to jointly talk about options and benefits that are available through renewable energy and battery storage solutions,” he said.

Read our two-part feature article on flow batteries including potential routes to market, ‘Long Time Coming’, which profiled four makers of different long duration energy storage systems based on the technologies. (Part 1, Part 2)

Read Next

November 13, 2025
Critical minerals manufacturer and lithium-ion battery recycling company American Battery Technology Company (ABTC) has been selected to recycle batteries from the Moss Landing Energy Storage Facility in Monterey County, California, US.
Premium
November 7, 2025
UK BESS projects totalling nearly 4GWh awarded planning consent in October, there is now nearly 22GWh under construction.
November 7, 2025
Trina Storage has signed a memorandum of understanding (MoU) with Pacific Green Energy Group to supply up to 5GWh of battery energy storage systems between 2026 and 2028.
November 5, 2025
LG Energy Solution and Stellantis’ joint venture (JV), NextStar Energy, Canada’s first large-scale lithium-ion (Li-ion) battery manufacturing plant, is expanding to produce energy storage system (ESS) batteries.
November 4, 2025
UK power generator Drax is set to acquire three BESS projects from York-based developer Apatura, with a combined capacity of 260MW.

Most Popular

Email Newsletter