Investment tax credit for energy storage systems over 5kWh in US budget proposal

By Liam Stoker
LinkedIn
Twitter
Reddit
Facebook
Email
Standalone battery storage projects do not qualify for an ITC in the US yet Image: Vistra Energy.

Investment tax credit (ITC) incentives for energy storage have been included in the US House of Representatives’ chief tax-writing committee, along with extensions to the solar ITC and reintroduction of a solar production tax credit (PTC). 

The House Ways & Means Committee introduced its draft legislative measures for the federal Budget Reconciliation late last week, including its Committee Print for Subtitle G — a section pertaining to green energy, detailing new and existing renewable energy and energy efficiency incentives to be included within the budget resolution. 

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

Clean energy advocates, industry groups and a growing number of state and national-level policymakers have been calling for an ITC for energy storage for some time. In March, Oregon 3rd District Congressman described the ITC as a “once-in-a-generation opportunity to drive the growth of energy storage and take long overdue steps to save our planet”.

Subtitle G introduces the ITC for batteries or other technologies used to store electricity with a minimum capacity of 5kWh. They will be eligible for a base credit rate of 6% or a bonus credit rate of 30%.

Credits will be applied through to the end of 2031, phasing down in 2032 and 2033. As it stands, no energy storage project which begins construction after 2033, or which is not in service before 2036 will qualify. 

Also among other new ITC-eligible properties are linear generators, microgrid controllers, dynamic glass and biogas systems. 

Systems which meet domestic content requirements can get an increased base credit or bonus credit rate — these will not be subject to a 2032 or 2033 phasedown. There will also be incentives to manufacture within the US.

As our sister site PV Tech reported yesterday, the proposals would would extend the Solar Investment Tax Credit (ITC) for 10 years at 30%, but only for projects meeting certain labour conditions.

A domestic content bonus could meanwhile boost tax credits for solar projects to 40%, while a revival of the production tax credit (PTC) for solar will remain in place until 2031, phasing down by 20% each year in 2032 and 2033. 

Read about the solar provisions of the bill in PV Tech’s coverage here. There remains some distance before these measures are passed into law. In pursuing these measures through a budget reconciliation US Democrats do not need a full majority in both the Senate and House, however the legislative procedure could see these recommendations amended in negotiations across the aisle.

Additional reporting by Andy Colthorpe.

Read Next

June 18, 2025
Distributed energy company Scale Microgrids has closed US$275 million to support 140MW of distributed generation projects, including battery storage installations in several US states.
June 18, 2025
Home battery systems company Haven Energy and California utility Clean Energy Alliance (CEA)  have partnered to provide homeowners in the state with battery energy storage systems (BESS) at no purchase or installation cost.
Premium
June 17, 2025
Q2 2025 saw the sharpest jump in battery energy storage system (BESS) prices since 2021, according to procurement platform Anza Renewables’ Q2 US energy storage pricing insights report.
June 17, 2025
US tax credits for energy storage projects could be retained even if solar PV, wind and electric vehicle (EV) incentives face cuts.
June 13, 2025
Power company AES Corporation has completed construction of the 1,000MW Bellefield 1 project in Kern County, California. The project includes 500MW of solar and 500MW/2,000MWh of battery storage.

Most Popular

Email Newsletter