India details compulsory new solar component quality standards

LinkedIn
Twitter
Reddit
Facebook
Email
Manufacturers will have to apply to the Bureau of Indian Standards (BIS) to obtain registration. Credit: MNRE

India’s Ministry of New and Renewable Energy (MNRE) has issued a new order seeking to improve the quality of components in the solar sector, including batteries to be used for stationary energy storage.

The ‘Solar Photovoltaics, Systems, Devices and Components Goods (Requirements for Compulsory Registration) Order, 2017’ is due to come into force 12 months after it was published in the government’s official gazette.

Manufacturers will have to apply to the Bureau of Indian Standards (BIS) to obtain registration and be able to use a new Standard Mark. All goods sold, stored, imported, manufactured or distributed will have to conform to the new specified standard.

Otherwise, defective or non-compliant goods will be “deformed beyond use and disposed of as scrap”.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

The ruling will apply to modules, inverters and energy storage batteries. Samples shall be taken at least once every two years for each product or series of products. According to guidance issued by MNRE in April, this means energy storage batteries must comply with Indian Standard Number IS 16270: Secondary Cells And Batteries For Solar Photovoltaic Application – General Requirements And Methods Of Test published by the Bureau of Indian Standards in 2014.

Former power minister Piyush Goyal had issued a warning about quality to the industry at Intersolar Europe back in June, however, analysts at Bridge to India had said that the new standards would not be any tighter than those of the IEC. The only real change would be the inspections on site within India and the mandate to obtain an India-approved certification.

India’s attempt to brush off its sometimes tarnished reputation for quality projects was discussed in the most recent edition of PV Tech Power, just published.

Read Next

November 6, 2026
India’s Union government has approved the next IR145 billion phase of Viability Gap Funding (VGP) for energy storage capacity additions.
November 5, 2026
Democrats scored major victories in the US Midterm elections, taking both the House and Senate and flipping several long-held Republican strongholds, with changes likely to occur in the clean energy sector.
October 29, 2026
Scatec, the European Investment Bank (EIB), the European Bank for Reconstruction and Development (EBRD) and the African Development Bank (AfDB) have signed an investment agreement for Dandara solar-plus-storage project in Egypt.
October 28, 2026
India’s storage market is expanding, but project delivery depends on predictable procurement, domestic manufacturing and revenue models that support investment.
October 27, 2026
India has 5.3GWh of operational battery energy storage system (BESS) capacity, with a further 185GWh of projects under development, according to Prashant Bhamu, deputy director of integrated resources planning at the Central Electricity Authority (CEA), part of the Ministry of Power.