EDF Renewables places repeat order with Wärtsilä for 100MWh UK battery storage project

By Lena Dias Martins
December 8, 2022
LinkedIn
Twitter
Reddit
Facebook
Email

Technology group Wärtsilä Energy has signed an additional contract with EDF Renewables UK for a 50MW/100MWh lithium-ion energy storage facility in Sundon, Bedfordshire in southern England.

The project – due to begin construction in spring 2023 – will increase intermittency management and renewable energy integration, as well as strengthening the resilience of the electric system, and balancing supply and demand by charging and discharging automatically.

The Sundon facility will also support electric vehicle (EV) charging and the electrification of public transport.

The contract includes Wärtsilä’s GridSoly Quantum system and GEMS Digital Energy Platform. The GEMS technology delivers data and insights for trading parties and performance for comprehensive asset management.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

EDF Renewables UK and Wärtsilä previously partnered on a 50MW transmission-connected battery storage system in the history university city of Oxford, which went live in June last year and the 50MW/50MWh battery storage system in Kemsley, Kent, which went live in October last year. 

To read the full version of this story, visit Solar Power Portal.

Energy-Storage.news’ publisher Solar Media will host the 8th annual Energy Storage Summit EU in London, 22-23 February 2023. This year it is moving to a larger venue, bringing together Europe’s leading investors, policymakers, developers, utilities, energy buyers and service providers all in one place. Visit the official site for more info.

13 October 2026
London, UK
Now in its second edition, the Summit provides a dedicated platform for UK & Ireland’s BESS community to share practical insights on performance, degradation, safety, market design and optimisation strategies. As storage deployment accelerates towards 2030 targets, attendees gain the tools needed to enhance returns and operate resilient, efficient assets.

Read Next

February 23, 2026
European Union countries have made limited progress on energy storage deployment and electricity network flexibility recommendations.
February 23, 2026
Fotowatio Renewable Ventures has unveiled plans for a 1.2GW/5GWh portfolio of battery energy storage system (BESS) projects in Spain.
February 20, 2026
A flurry of BESS project news from big-name players in Western Europe in the run-up to the Energy Storage Summit next week, with Neoen, Statkraft, Zenobē and Infranode moving projects forward in Germany, Ireland, the UK and Denmark. Highlights include a 15-year toll between Drax and Zenobē, and multiple 4-hour duration systems.
February 18, 2026
More needs to be done to cement energy storage’s vital role in European energy resilience, writes Teresa Casacchia, head of storage at Baywa r.e.
February 18, 2026
Australia’s Clean Energy Council has said that 2025 saw as many battery energy storage systems commissioned as in the last 8 years combined.