Canadian Solar to provide 315MWh BESS, 2GWp solar for Sunraycer projects in Texas

LinkedIn
Twitter
Reddit
Facebook
Email

Solar PV and battery energy storage system (BESS) firm Canadian Solar will deliver 315MWh of BESS and up to 2GWp of solar modules to Sunraycer Renewables for projects in Texas, US.

Canadian Solar has executed three agreements with Sunraycer for two BESS projects in Texas and the purchase of up to 2GWp of solar modules for various Sunraycer projects.

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

E-Storage, Canadian Solar’s energy storage subsidiary, will provide 188MWh DC to the Gaia project in Navarro County, Texas and 127MWh DC to the Midpoint project in Hill County, Texas. The projects are scheduled for commissioning in Q3 of 2025.

The projects will both use over 60 SolBank 3.0 battery containers. The containerised energy storage system features lithium-iron-phosphate (LFP) cells, e-Storage’s battery management system software, and a modular design.

Sunraycer will also deploy up to 2GWp of Canadian Solar’s solar modules across various projects. Canadian Solar says the modules offer up to 85% bifaciality and 23.3% module efficiency, with low power degradation and high energy yield. The company claims these features will reduce the levelised cost of energy (LCOE) and system cost.

Colin Parkin, president of e-Storage said of the recent agreements: “We are excited to strengthen our presence in Texas with the Gaia and Midpoint projects. These two battery energy storage installations represent a significant contribution to Texas’s growing renewable energy infrastructure, enhancing grid stability and supporting the state’s clean energy transition.”

Texas, where the grid is managed by ERCOT, is the second most active BESS market in the US after California, though developing there is not without its challenges.

In Van Zandt County, 20 residents have filed a lawsuit seeking damages and an injunction (Premium access article) against the renewable energy investment arm of Finland’s Taaleri Group and the US arm of UK-based RES Group over the construction of a lithium-ion BESS.

This followed the October news that council members at Katy, Texas voted to deny a Special Use Permit for a 500MW standalone BESS proposed by IPP Vesper Energy (Premium access article).

On the upstream side, Texas is also where Freyr acquired Chinese firm Trina Solar’s manufacturing facility, in Wilmer. Freyr claims creating US solar production facilities will solve a bottleneck for developers.

Canadian Solar meanwhile was also involved in taking over a BESS and cell manufacturing facility in Kentucky, in a factory vacated by metal-hydrogen battery company EnerVenue. Canadian Solar is set to invest an initial US$384 million into the facility through e-Storage.

The deployment of solar and energy storage projects in the US should be boosted by upstream projects like these. However, time will tell how newer US facilities compare to established facilities elsewhere, notably in China which dominates the solar and BESS markets.

1 July 2025
London, UK
UK Solar Summit 2025 will look at the role solar currently plays in the energy mix, how this will change over the coming years and how this aligns with net-zero and other government targets. We will break down all these challenges and help build up solutions through discursive panels, motivational keynotes and case studies, with newly added interactive sessions to get you moving and meeting your peers, making the connections you need to boost your business.

Read Next

January 15, 2025
Developer PureSky Energy has extended its Non-Binding Offer (NBO) deadline for a 794MW/1,588MWh portfolio of battery energy storage system (BESS) projects in Texas, US, to Friday, 24 January.
January 14, 2025
Energy storage deployments globally increased by over half in 2024, with the grid-scale segment the driver of this, market intelligence firm Rho Motion’s head of research writes in this contributed article.
January 14, 2025
Eni Plenitude, the utility arm of the large oil and gas major Eni, has completed construction of the 200MW/400MWh Guajillo battery energy storage system (BESS) project in Texas, US.
January 14, 2025
Developer Boralex and its partner Walpole Island First Nation have announced a CA$172 million (US$119 million) financing for the 80MW/320MWh Tilbury battery energy storage system (BESS).
January 14, 2025
Rho Motion’s head of research Iola Hughes analyses some of the trends shaping the battery storage supply chain as market growth accelerates worldwide.

Most Popular

Email Newsletter