California Energy Commission releases US$46 million for DERS supporting grid reliability

LinkedIn
Twitter
Reddit
Facebook
Email

The California Energy Commission (CEC) has released over US$46 million for the state’s Distributed Electricity Backup Assets (DEBA) Programme.

Announced 23 October, the US$46.14 million is being released through a Grant Funding Opportunity (GFO).

The DEBA Programme provides funding for distributed energy resources (DERS), including battery energy storage systems (BESS), microgrids, and load flexibility technologies that can increase supply or shift load to improve grid reliability and help avoid blackouts during extreme events.

DEBA was established as part of California’s Strategic Reliability Reserve, which was created in 2022 and formed part of Governor Gavin Newsom’s Assembly Bill (AB) 205, which also introduced the CEC’s opt-in certification scheme for BESS projects exceeding 200MWh. 

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Speaking with Energy-Storage.news at the US Solar & Storage Finance event in Garden Grove, California, CEC Commissioner Noemí Gallardo highlighted the opt-in scheme as a sign of the Commission’s growing role in fast-tracking large-scale storage.

Gallardo noted that the CEC has “approved three projects already,” or, “about two gigawatts”, since the programme’s launch. DEBA represents a parallel avenue stemming from the same 2022 legislation, aimed at channelling funding directly toward grid-reliability-focused BESS deployment.

In 2025, utility-scale developer SB Energy received a US$25 million grant from the CEC, through DEBA, to purchase BESS for a solar and storage project in Riverside County, California.

Submissions for the GFO are due by 26 January 2027. The CEC will hold a pre-application workshop discussing the solicitation on 5 November 2026.

The submission and questions deadlines can be found on the CEC’s website.

26 November 2026
9am GMT / 1pm GST
In this webinar, Florian Didier and Salomé Perperot from Clean Horizon share the approach they use when supporting IPPs through optimiser selection and contract negotiation across Europe. The presentation will be followed by a live Q&A session in which attendees can put their own questions to the speakers. Who should attend: IPPs and developers, asset owners and investors, lenders and financial advisors, and anyone involved in the commercial structuring of battery storage projects.
2 February 2027
The Tower Hotel, London, UK
Solar & Storage Finance Europe Summit brings together the developers, investors and lenders financing European solar and storage projects. As grid constraints, curtailment and weaker capture prices put pressure on returns, the summit explores what makes projects bankable, how co-located storage changes the revenue case and where capital providers see investable opportunities. Attendees can compare how their peers structure projects and meet people who could help them move their own projects or investments forward.
22 February 2027
InterContinental London - The O2, London, UK
The Future of Energy Storage Starts Here Three days in London where developers, IPPs, investors, utilities and the manufacturers building the technology come to close deals, not swap business cards. If you need to be in the room with the people deploying capital into European storage, this is that room.
20 April 2027
Renaissance Dallas at Plano Legacy West Hotel, Dallas, Texas, Dallas
Policy, Procurement and Power Demand: Defining the Next Chapter for Energy Storage. Two days in Dallas where developers, IPPs, investors, utilities and the manufacturers building the technology come to close deals, not swap business cards. If you need to be in the room with the people deploying capital into US storage, this is that room.

Read Next

November 18, 2026
Energy-Storage.news speaks with LG Energy Solution Vertech chief product officer Tristan Doherty at RE+ 2026.
November 18, 2026
EsVolta has completed over US$180 million in financing for BESS projects in Texas, while Fluence has won a 200MWh project there.
November 18, 2026
US-headquartered energy storage technology firm ESS Inc has ceased operations and filed for Chapter 7 bankruptcy, while system integrator Stem Inc doubts its near-term ‘ability to continue as a going concern’ and just sold its core software platform Athena.
November 18, 2026
AGL Energy has received federal environmental clearance for a 500MWh battery energy storage system in Queensland under Australia’s EPBC Act.
November 17, 2026
Waaree ESS has begun commercial production at its 5.15GWh battery pack manufacturing line in Rola, Valsad, Gujarat.