Peter Asmus

November 1, 2016

From the outside, the VPP looks like a single power production facility that publishes one schedule of operation and can be optimised from a single remote site. From the inside, the VPP can combine a rich diversity of independent resources into a network via the sophisticated planning, scheduling, and bidding of DER-based services. Peter Asmus examines the role energy storage can play within this architecture.

Most Popular

Upcoming Events

May 20
 - May 21
, 2026
London, UK
May 20
 - May 20
, 2026
Porto, Portugal
June 2
 - June 4
, 2026
Johannesburg, South Africa
June 9
 - June 11
, 2026
Stuttgart, Germany
June 23
 - June 25
, 2026
Munich, Germany