Peter Asmus

November 1, 2016

From the outside, the VPP looks like a single power production facility that publishes one schedule of operation and can be optimised from a single remote site. From the inside, the VPP can combine a rich diversity of independent resources into a network via the sophisticated planning, scheduling, and bidding of DER-based services. Peter Asmus examines the role energy storage can play within this architecture.

Email Newsletter

Most Popular

Upcoming Events

September 18
 - September 22
, 2023
CCL Lisbon Congress Centre, Lisbon, Portugal
September 26
 - September 27
, 2023
Warsaw, Poland
September 27
 - September 27
, 2023
9am (EDT) / 3pm (CEST)
September 28
 - September 28
, 2023
London, UK
October 3
 - October 4
, 2023
Toronto, Canada
October 10
 - October 12
, 2023
Brussels, Belgium