UK’s approved BESS pipeline grows to 162GWh, nearly 22GWh under construction

By Cameron Murray, Charlotte Gisbourne
November 7, 2025
LinkedIn
Twitter
Reddit
Facebook
Email

Grid-scale BESS projects totalling nearly 4GWh were awarded planning consent in the UK during October, while there is now nearly 22GWh under construction.

The figures come from Solar Media Market Research’s Battery Storage: UK Pipeline & Completed Assets Database report. 

Projects totalling 1,358MW of power and 3,700MWh of capacity were given the green light by local and national government to go-ahead in October, bringing the total approved pipeline to 77.9GW/162.5GWh.

October’s figure is the most large-scale battery energy storage system (BESS) approvals by capacity since July, when around 5GW/10GWh was given the go-ahead by either local authorities or central government.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Notable projects that were given the green light last month include Qair UK’s 342MW Red Moss BESS project in South Lanarkshire, Scotland, and Evolution Power’s 165MW Stonestreet Green solar-plus-storage project in Kent, England, as reported by our sister site Solar Power Portal.

Owing to their size, both projects were approved at the national level: Red Moss by the Scottish Energy Consents Unit (ECU) and Stonestreet Green by secretary of state for energy and climate change Ed Miliband via a development consent order (DCO). 

The Report’s data also shows that there is now 9,937MW/21,883MWh of large-scale BESS capacity under construction. The figures from our colleagues at Solar Media Market Research are posted on a monthly basis as part of an ESN Premium series that will run to the end of this year.

Using project-level data, we can see the breakdown of these projects under construction by region, with Scotland the clear leader with nearly 6GWh being built.

Half of that is from three c.500MW/1,000MWh projects from Copenhagen Infrastructure Partners (CIP), which ESN Premium discussed with one of the investor’s partners last year.

The largest single project currently being built in the UK is the 1,400/3,100MWh Thorpe Marsh project from Fidra Energy, in South Yorkshire, Yorkshire and Humberside region.

That accounts for more than half of the Yorkshire and Humberside region’s 2.4GW/5.2GWh under construction, 23.6% of the UK’s total (second highest after Scotland).

RegionMWMWhPercentage of total
Yorkshire and Humberside2404.85169.523.6%
West Midlands1096319614.6%
Wales482992.54.5%
South West300.3600.62.7%
South East (inc. London)767.31484.26.7%
Scotland2838.15906.427.0%
North West592.91386.56.3%
North East449.81249.75.7%
Eastern248.4432.82.0%
East Midlands757.31464.76.7%
Total9,936.921,882.9

The UK has 7,862MW/11,765MWh of operational grid-scale capacity, with almost 2GW/3.5GWh added in 2025 alone, a 36% increase year-on-year, with 2 months still remaining.

If you would like to understand more about the pipeline, where this data came from, and Solar Media Market Research, please reach out to [email protected].

13 October 2026
London, UK
Now in its second edition, the Summit provides a dedicated platform for UK & Ireland’s BESS community to share practical insights on performance, degradation, safety, market design and optimisation strategies. As storage deployment accelerates towards 2030 targets, attendees gain the tools needed to enhance returns and operate resilient, efficient assets.

Read Next

February 11, 2026
Netherlands-based iron-air long-duration energy storage (LDES) startup Ore Energy has completed a grid-connected pilot of its 100-hour iron-air LDES system at EDF Lab les Renardières in France.
Premium
February 11, 2026
Owner-operator Fidra Energy came out of virtually nowhere to be building one of Europe’s largest BESS in the UK, the 1.4GW/3.1GWh Thorpe Marsh project. We catch up with CEO Chris Elder, about its strategy and projects but also broader BESS and clean energy financing trends.
February 10, 2026
Energy infrastructure platform Revera Energy has completed an expanded US$150 million credit facility to accelerate development and construction of its battery storage, solar, and green hydrogen project pipeline across Australia and the UK.
February 9, 2026
Europe’s energy storage market has hit a turning point. What was once a scattered, early-phase market featuring pilot projects and daring developers has swiftly evolved into a dynamic, capital-intensive infrastructure sector, writes Wood Mackenzie research associate Cecilie Kristiansen.
February 6, 2026
Home battery storage and virtual power plant (VPP) specialist Lunar Energy has raised US$102 million in an oversubscribed Series D financing round led by B Capital and Prelude Ventures.