First large-scale BESS in Estonia online with LG ES batteries

LinkedIn
Twitter
Reddit
Facebook
Email

State-owned utility and power generator Eesti Energia has completed and put into commercial operation the first large-scale BESS in Estonia.

Eesti Energia officially inaugurated the 26.5MW/53.1MWh battery energy storage system last week (26 March), located at the Auvere industrial power plant complex in Ida-Virumaa. However, the project has been online since 1 February, in time for the Baltic region’s decoupling from the Russian grid a week later.

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

Minister of Finance Jürgen Ligi attended the inauguration and commented: “For a democratic nation, having renewable energy storage capacity is crucial for enhancing energy independence. It’s also heartening that this investment incorporates technology from the free world.”

Ligi didn’t make clear what he meant by the latter point. The project was deployed by local system integrator Diotech Group using BESS units from South Korea-headquartered lithium-ion OEM LG Energy Solution (LG ES), while local engineering firm Enefit Solutions did installation and connection work. Eesti’s first procurement failed, with the second successfully completed in January 2024.

Eesti Energia said the BESS will enhance grid stability and reduce costs for consumers by participating in all available electricity markets.

The firm invested €19.6 million (US$21.2 million) in the project, which it discussed with Energy-Storage.news in an interview in August 2024 (Premium access), including why it needed a second procurement.

The company claimed that not only is it the biggest BESS in Estonia, but also in the whole Baltic region. This may be true, though the four 50MW/50MWh BESS projects deployed in Lithuania by Fluence are often considered one project.

Kristjan Kuhi, part of Eesti Energia’s management board, commented: “An additional positive impact will also be felt in the day-ahead electricity market, where the battery will be able to smooth out high price peaks for consumers and create demand in the market during times of surplus production.”

Eesti is also developing a 225MW pumped hydro energy storage (PHES) project.

As mentioned earlier, the Baltic region recently desynchronised from the BRELL network (Belarus, Russia and formerly also Estonia, Lithiuania and Latvia) and synchronised with that of Continental Europe, via a connection in Poland.

The process, over a decade in the making, gave another impetus for the deployment of large-scale BESS, on top of growing renewable penetration. The region has become a hotbed of energy storage activity relative to its size, with deployments from both state-owned companies like Eesti as well as private developers and operators.

23 September 2025
Warsaw, Poland
The Energy Storage Summit Central Eastern Europe is set to return in September 2025 for its third edition, focusing on regional markets and the unique opportunities they present. This event will bring together key stakeholders from across the region to explore the latest trends in energy storage, with a focus on the increasing integration of energy storage into regional grids, evolving government policies, and the growing need for energy security.

Read Next

June 25, 2025
Energy storage developer Eku Energy has entered the New Zealand battery energy storage system (BESS) market.
June 24, 2025
AEMO has issued a call for 6-hour duration BESS in Western Australia to support grid reliability as coal-fired power plants are withdrawn.
June 20, 2025
IPP MET Group has put a 40M/80MWh BESS in Hungary into commercial operation, deployed using technology from Huawei.
Premium
June 19, 2025
We caught up with the CEO of Bulgaria-based International Power Supply (IPS) to discuss its claimed first mass-scale cell-to-system BESS manufacturing facility in Europe and its ultra-high density 20-foot product.
June 19, 2025
LCOS for battery storage in the US has declined enough recently to offset increases between 2021 and 2024, according to Lazard.

Most Popular

Email Newsletter