VIDEO: Powering certainty with Elementa 2 Pro, bankable energy storage from Trina

By Solar Media Staff
December 3, 2025
LinkedIn
Twitter
Reddit
Facebook
Email

Energy-Storage.news proudly presents our sponsored webinar with Trina Storage, ‘Powering Certainty: Bankable Energy Storage, with Elementa 2 Pro’.

As utility-scale energy storage projects grow in capacity and complexity, the industry is shifting its focus from basic performance claims to fully validated, risk-controlled and finance-ready solutions. Developers, utilities and investors now demand bankability with proof, not promise.

In this on-demand webinar, Trina Storage introduces the Elementa 2 Pro Platform, a fully wrapped cell-to-AC energy storage solution engineered to eliminate integration risk and accelerate deployment certainty. The platform combines the DC battery block, PCS, transformer and EMS into one unified system, and every configuration undergoes US-based State-Side Integration Testing (SSIT) before delivery. This ensures each AC platform arrives on-site field-ready, compliant, and deployment certified, reducing commissioning time and engineering uncertainty.

Trina Storage will also unveil how its proprietary Dynamic Degradation Curve™ moves beyond theoretical, static cycle assumptions by modelling real-world cycling patterns. This enables more accurate lifetime revenue forecasts and stronger levelised cost of storage (LCOS) outcomes, which are critical for investors, IPPs and long-duration contract structures.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

In addition, participants get an exclusive preview of Trina Storage’s upcoming installation-level Large-Scale Fire Test (LSFT), a system-level burn test that intentionally disables fire suppression and triggers full thermal runaway to simulate worst-case field conditions. This next-level safety validation goes beyond regulatory compliance, providing real-world evidence of Trina’s passive fire barrier engineering and container-to-container propagation control.

Supported by full traceability, US-based partner infrastructure and local contracting/service capability, Elementa 2 Pro Platform is engineered to provide bankability not only at launch, but throughout its entire lifecycle.

This session is ideal for developers, IPPs, utilities, EPCs and investors seeking deployment-ready, safety-validated and financially dependable BESS platforms for the US and global markets.

Speaker:

Mike Watson, head of product, Trina Storage North America

Moderator:

Andy Colthorpe, editor, Energy-Storage.news

See the webinar on YouTube below. You can also register to watch the webinar and get access to presentation slides from the on-demand section of our website, where you can also find all our other great Energy-Storage.news webinars.

Read Next

December 23, 2025
Energy-Storage.news proudly presents our sponsored webinar with NYSERDA, ‘Discover how New York powers energy storage innovation’.
December 23, 2025
As 2025 draws to a close, here’s a look back at a selection of Guest Blog contributions published by Energy-Storage.news over the past 12 months.
December 22, 2025
Building US domestic energy storage manufacturing capacity will require more than limiting foreign participation, writes Aaron Marks of Intertek CEA.
Premium
December 17, 2025
Ford Motor Company’s entry into the “fiercely competitive” energy storage market is a “big strategic pivot,” but one that makes sense, ESN Premium has heard.
December 16, 2025
Waratah Super Battery developer Akaysha Energy has put the first phase of its Ulinda Park BESS project into operation in Queensland, Australia.