Tesla Powerpack to enter UK’s FFR market with Open Energi technology

LinkedIn
Twitter
Reddit
Facebook
Email
The 500kWh Tesla Powerpack battery storage system is co-located with a solar farm and will tender to offer FFR services to National Grid next month. Image: Open Energi.

UK firm Open Energi’s Dynamic Demand technology has been integrated with Europe’s first grid-scale Tesla Powerpack installation in Somerset, UK, in preparation for the site entering the firm frequency response (FFR) tendering market.

The 500kWh battery storage system, which is co-located with a 500kWp solar farm, will be able to automatically store and discharge energy in response to electricity supply and demand across the UK.

Open Energi’s Dynamic Demand technology optimises the system’s operating profile to maximise revenue opportunities throughout the day, applying designed management techniques, while limiting the degradation of the battery lifetime.

The site is able to respond to changes in the grid within the 10 second demands of the FFR tender by National Grid, and has the capability to respond within one second if the site bids into future Enhanced Frequency Response (EFR) tenders.

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

Not ready to commit yet?
  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

If successful in next month’s tender, an FFR contract with National Grid will allow the site to deliver new revenues for Camborne Energy Storage, which has a vested interest in the project. This is in addition to those taken from arbitrage whereby the Powerpack charges from the solar farm, or the grid during low pricing periods, and sells this into the market during peak demand periods.

David Hill, strategy director at Open Energi, said: “Energy storage is helping the UK transition to a smarter, cleaner energy system, but there’s more to unlocking value from it than putting a battery in a field.

“We’re using the latest machine learning techniques to manage battery performance in real-time. By understanding and managing state of charge in relation to fluctuations in solar PV generation and changes in electricity supply and demand we can maximise revenues and minimise wear and tear.”

source: Open Energi

The Somerset project is the first co-located energy storage project from CES, starting 2017 with around 50MW of consented sites ready for development.

Dan Taylor, managing director at CES, said: “We have ambitious deployment targets for energy storage in the UK and this successful project is an exciting step forward for us and the industry. It demonstrates the vital role of energy storage in delivering secure, low carbon power to the UK.

“We are aiming to co-locate further energy storage with renewable generation throughout the UK and help make our electricity system fit for the future.”

Speaking to Energy-Storage.News’ sister site Solar Power Portal about these future projects, Taylor explained that CES takes a technology-agnostic approach, meaning not all future sites are likely to feature more Tesla Powerpack systems.

Read Next

September 12, 2025
Dutch BESS operator Return has acquired four ready-to-build (RTB) projects in Germany, while agrifood tech and renewables investor N2OFF has added BESS to a solar project it is developing there.
September 11, 2025
It’s still to early to see the financial impact on energy storage suppliers in the wake of Trump’s tariffs and legislation, writes Solar Media analyst Charlotte Gisbourne, analysing their H1 revenues.
September 10, 2025
Fidra Energy has secured £1 billion for the largest BESS in the UK, while EDF and Elements Green have agreed a toll for a 720MWh system.
September 10, 2025
Tesla has announced that by the end of 2026, it expects to have around 4.5GW of grid-forming battery storage operating across Australia.
September 9, 2025
Tesla announced its new integrated 20MWh battery energy storage system (BESS) solution, the Tesla Megablock, on 8 September in Las Vegas, US.

Most Popular

Email Newsletter