TagEnergy has commissioned a 240MW/480MWh project in France while Iberdrola has done the same with a 58MW/120MWh system in Spain, the two largest projects in each country. Meanwhile Engie, ACL Energy and Chint Solar Europe have moved to construction on projects in Belgium, Italy and Germany.
Allianz GI, Luxcara and Return have acquired BESS projects and portfolios in Germany, Finland and Spain; Low Carbon, OX2, Cero Generation and Revera have taken FIDs on projects in Poland, Finland and the UK; and NHOA Energy has received a 600MWh order in Italy. All in all, the projects total at least 3.7GWh of capacity.
Utility and power generation firm Engie has started construction on a 100MW/400MWh BESS project in Belgium, for which it has enlisted system integrator NHOA Energy to provide the BESS.
System integrator NHOA Energy will provide Spanish transmission system operator (TSO) Red Eléctrica with 140MW/105MWh of BESS for two separate storage-as-transmission projects on the Balaeric Islands.
Taiwan Cement Corporation has increased its valuation of battery storage and electric vehicle infrastructure solutions provider New HOrizons Ahead (NHOA).