The Energy Storage Report 2024

Now available to download, covering deployments, technology, policy and finance in the energy storage market

South Korea offers central market contracts for 260MWh energy storage in Jeju Island tender

LinkedIn
Twitter
Reddit
Facebook
Email

South Korea last week launched a competitive solicitation for large-scale energy storage systems on Jeju Island, a southern province of the country.

The South Korean Ministry of Trade, Industry and Energy (MOTIE) on 17 August announced the tender, through which it is opening up a “central contract market” for battery energy storage.

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

The solicitation will seek battery energy storage system (BESS) resources totalling 65MW output and 260MWh. Projects eligible for bids will be of 4-hours or more duration, and will receive 15-year long-term contracts.  

The aim is to help effectively integrate the output of renewable energy generation on the island, which is a popular holiday destination known for its landscapes and sandy beaches as well as being home to Korea’s tallest mountain, the 1,950 metre Hallasan Mountain range. The island province is home to several hundred thousand people, but in 2022 (admittedly mid-pandemic) it welcomed more than 12 million domestic tourists.

The ministry said this marks the first time the Korean government has offered a central contract market for low-carbon power sources.

According to its release, compensation in the current electricity market system is set by a single wholesale price across the country, making it difficult to set reasonable tariffs for energy storage systems in particular locations.

Identifying Jeju Island as being in most urgent need of energy storage resources to help control the output of renewable energy generation and maintain stability of the electricity network, the central contract structure has been introduced there first.

MOTIE said the 60MW/260MWh volume being tendered for corresponds to needs modelled in the national 10th Basic Plan for Electricity Supply and Demand and would be sufficient in the short-term for stabilising the Jeju grid.

Bids will be judged on a combination of price and non-price factors, with the latter including things like technical capability, safety and contribution to local industry and economy.

South Korea had been a leader in energy storage deployments in the late 2010s, based largely on tariffs payable for commercial and industrial (C&I) energy storage systems, but this took a downturn following a spate of fires. The country is also home to some of the best-known lithium battery brands such as Samsung SDI, LG and SK.

Nonetheless, at the recent Energy Storage Summit Asia 2023 hosted by our publisher Solar Media, attendees heard the country is still perhaps the most mature energy storage market in the Asia-Pacific region after China, although the Australian market is now starting to see growing deployments of large-scale BESS facilities and Japan has recently reconfigured its power market regulations and created incentives for energy storage to help manage the integration of renewables.

Read Next

May 14, 2024
Utility DTE Energy has launched a request for proposals (RFP), seeking approximately 120MW of standalone energy storage projects in its Michigan, US, service area.
May 14, 2024
Puerto Rico Electricity Board (PREB) has approved a plan to accelerate the adoption of battery energy storage system (BESS) technology in the US island territory.
May 10, 2024
Ontario’s Independent Electricity System Operator (IESO) has made Canada’s biggest energy storage procurement to date, selecting nearly 1.8GW of projects through a Request for Proposals (RFP).
May 8, 2024
Developer Oracle Power and China Electric Power Equipment and Technology (CET) are looking to develop and build a 1.3GW project combining solar, wind and battery energy storage system (BESS) technology in Pakistan.
May 8, 2024
Over a gigawatt of bids from battery storage project developers have been successful in the first-ever competitive auctions for low-carbon energy capacity held in Japan.

Most Popular

Email Newsletter