Solar, wind and energy storage proposals for New South Wales Renewable Energy Zone come flooding in

By Sean Rai-Roche
LinkedIn
Twitter
Reddit
Facebook
Email
Rendering of Riverina, a 200MWh battery storage project under development in New South Wales. Image: Edify.

The Australian state of New South Wales (NSW) has received proposals for more than 34GW of solar, wind and energy storage for its South-West Renewable Energy Zone (REZ), more than 10 times the likely capacity of the site.

NSW, through its recently formed Energy Corporation that will oversee the state’s REZs, held a registration of interest (ROI) in October and November 2021 for the South-West REZ, which is one of five planned zones in Australia.  

In total, 49 applications from renewables and storage developers made up the 34GWs of proposals, which was 13 times the intended capacity for the REZ, according to James Hay, Energy Corporation CEO, adding that the REZ will be no less than 2.5GW in capacity.

The South-West REZ is to be located to the west of the city of Wagga Wagga and straddle the state’s border with Victoria. 

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

To read the full version of this story, visit PV Tech.

Read Next

November 5, 2026
Democrats scored major victories in the US Midterm elections, taking both the House and Senate and flipping several long-held Republican strongholds, with changes likely to occur in the clean energy sector.
November 5, 2026
Eku Energy has fully commissioned its 250MW/500MWh Williamsdale BESS in the Australian Capital Territory (ACT).
November 5, 2026
Three developers have secured debt and equity for solar PV, wind and battery storage projects across Australia and New Zealand.
November 4, 2026
Australia has finished trialling grid-forming battery storage for system security services and needs contracts signed within two years.
Premium
November 3, 2026
ESN Premium speaks with Zane Zhou of CATL Australia and New Zealand, about TENER+, sodium-ion demand, the Collie BESS and more.