Solar, wind and energy storage proposals for New South Wales Renewable Energy Zone come flooding in

By Sean Rai-Roche
LinkedIn
Twitter
Reddit
Facebook
Email
Rendering of Riverina, a 200MWh battery storage project under development in New South Wales. Image: Edify.

The Australian state of New South Wales (NSW) has received proposals for more than 34GW of solar, wind and energy storage for its South-West Renewable Energy Zone (REZ), more than 10 times the likely capacity of the site.

NSW, through its recently formed Energy Corporation that will oversee the state’s REZs, held a registration of interest (ROI) in October and November 2021 for the South-West REZ, which is one of five planned zones in Australia.  

In total, 49 applications from renewables and storage developers made up the 34GWs of proposals, which was 13 times the intended capacity for the REZ, according to James Hay, Energy Corporation CEO, adding that the REZ will be no less than 2.5GW in capacity.

The South-West REZ is to be located to the west of the city of Wagga Wagga and straddle the state’s border with Victoria. 

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

To read the full version of this story, visit PV Tech.

Read Next

November 20, 2026
Energy transition expert Chris Nelder looks at which countries are leading the way in the geopolitical race for clean energy supremacy.
November 20, 2026
Another BESS Industry Buzz, looking at what people are discussing in the industry plus some of the most notable quotes from the RE+ trade show, which concluded yesterday.
November 20, 2026
EDF power solutions Australia has acquired the 250MW Holloway BESS project in New South Wales (NSW) from developer SynCo Global.
November 20, 2026
Australia committed a record 2.4GW of renewable energy projects to construction in the third quarter of 2026, while battery energy storage systems (BESS) committed in the quarter covered 13% of the new storage capacity needed by 2030.
Sponsored
November 19, 2026
Pressure-sensitive adhesive (PSA) tape suppliers are testing dielectric materials for BESS lifetimes of 30 years or more, as rising pack voltages push tracking performance requirements higher.