Solar, wind and energy storage proposals for New South Wales Renewable Energy Zone come flooding in

By Sean Rai-Roche
LinkedIn
Twitter
Reddit
Facebook
Email
Rendering of Riverina, a 200MWh battery storage project under development in New South Wales. Image: Edify.

The Australian state of New South Wales (NSW) has received proposals for more than 34GW of solar, wind and energy storage for its South-West Renewable Energy Zone (REZ), more than 10 times the likely capacity of the site.

NSW, through its recently formed Energy Corporation that will oversee the state’s REZs, held a registration of interest (ROI) in October and November 2021 for the South-West REZ, which is one of five planned zones in Australia.  

In total, 49 applications from renewables and storage developers made up the 34GWs of proposals, which was 13 times the intended capacity for the REZ, according to James Hay, Energy Corporation CEO, adding that the REZ will be no less than 2.5GW in capacity.

The South-West REZ is to be located to the west of the city of Wagga Wagga and straddle the state’s border with Victoria. 

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

To read the full version of this story, visit PV Tech.

Read Next

July 17, 2026
A subsidiary of Indian renewable energy equipment and component manufacturer Waaree Energies has opened a battery energy storage system (BESS) enclosure factory.
July 17, 2026
German solar and storage developer ib vogt has received state planning approval for the 120MW/480MWh Wagga North battery energy storage system (BESS) in New South Wales, Australia.
July 17, 2026
The Port of Newcastle has become the first port in New South Wales, Australia, to be approved to safely store grid-scale lithium-ion battery storage systems.
July 16, 2026
Gloucester Coa has received planning approval from the New South Wales government for the 3.6GWh Stratford Pumped Hydro and Solar project.
July 16, 2026
Australian transmission operator Transgrid has opened a pathway for 900MW of grid-forming inverter-equipped battery storage to contribute to New South Wales’ minimum system strength requirements.