Solar Energy Corporation of India tenders for 3MW of solar with battery storage in Ladakh

LinkedIn
Twitter
Reddit
Facebook
Email
Ladakh, India. Image: Solar Media.

The Solar Energy Corporation of India (SECI) has issued a tender for two 1.5MW(AC) solar power projects with battery energy storage systems of 0.75MW / 2.5MWh each at two locations in the Indian state of Jammu and Kashmir.

The tender, which has been issued on behalf of construction agency Military Engineer Services (MES), is for design, engineering, supply, construction, installation, testing, and commissioning of the two projects at Tangtse and Durbuk in Leh district (Ladakh). It also includes 10 years of operations and maintenance (O&M) services.

MES provides rear line engineering support to the Armed Forces. The Indian army is prominent in Ladakh due to the mountain region’s proximity with the Chinese and Pakistan borders. Temperature at the project locations range from -30°C to 30°C and altitude is around 3,000 metres.

The battery storage system will be interconnected with the local distribution network and designed for maximum flexibility with regard to voltages, frequency, phase imbalance and protection requirements, according to the tender document.

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

Not ready to commit yet?
  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

The whole capacity of the tender will be awarded to a single contractor and the deadline for bid submissions is 23 August 2018.

India recently moved a step closer to having its first lithium-ion cell manufacturing facility with an agreement between local firm Raasi Group and two research institutions. Meanwhile, any kind of energy storage technology will be permitted in hybrid wind and solar projects under the government’s recently released new hybrid policy.

William Brent, director of energy access coalition Power For All also recently guest blogged for our sister site PV Tech on how agro-centric mini-grids and solar trolleys could transform Indian farming.

31 October 2025
Greater Noida, India

Read Next

October 8, 2025
The NSW Independent Planning Commission has granted planning approval for Potentia Energy’s 500MW Tallawang solar-plus-storage project.
October 6, 2025
Following the recent notification, the Rajasthan government will develop 500MW/2,000MWh of standalone battery energy storage systems (BESS) with a four-hour single-cycle configuration and extended operational life. 
October 3, 2025
EDF Renewables has brought its 300MWh Milagro project online in New Mexico, while Enlight Renewable Energy has secured US$340 million in tax equity financing for its 940MWh Roadrunner project in Arizona.
September 30, 2025
According to the Q3 2025 US Energy Storage Monitor from Wood Mackenzie Power & Renewables and the American Clean Power Association (ACP), annual installations will not reach 2025 levels again until 2029.
September 29, 2025
Samsung C&T Renewable Energy Australia has submitted plans for a 300MWh solar-plus-storage project in Queensland to Australia’s EPBC Act.

Most Popular

Email Newsletter