ROUNDUP: 1MWh of zinc BESS installed at data centre, Invinity bags three ISO certifications and record grid reliability for utility Exelon

LinkedIn
Twitter
Reddit
Facebook
Email

Urban Electric Power installs 1MWh of alkaline batteries as backup in data centre

Urban Electric Power has replaced 1,000kWh of lead-acid batteries at the San Diego Supercomputer Center (SDSC) with an energy storage system comprised of its rechargeable alkaline battery technology.

The SDSC hosts the research computing loads for the University of California San Diego and has been an international leader in high-performance and data-intensive computing since its founding in 1985. The massive computer clusters and petabytes of storage it uses will now get their backup power from rechargeable alkaline batteries in the new energy storage system.

Urban Electric Power’s batteries uses zinc manganese-dioxide cells and the company has a patented method of making them rechargeable for 10 years or more.

There are 5,200 individual alkaline cells in SDSC’s initial installation, which store a total of 1MWh electricity. An additional 5,200 cells are on the way for a phase 2 installation in summer. The lead-acid batteries removed are now being recycled.

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

Not ready to commit yet?
  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

Invinity Energy Systems Receives Certification to Multiple Major ISO Standards

Vanadium redox flow battery (VRFB) company Invinity Energy Systems has been certified as compliant with three different International Organization for Standardization (ISO) standards follow an audit by global assurance provider SAI-Global.

The company claims it is the only flow battery manufacturer worldwide to hold all three standards concurrently. They are the standards for:

  • Quality Management ISO 9001
  • Environmental Management ISO 14001
  • Health & Safety Management ISO 45001

ISO 9001 sets out the criteria for an organisation’s quality management system (QMS). The second, ISO 14001, defines an Environmental Management System (EMS) as a systematic framework to ensure the measurement, management and minimisation of an organisation’s immediate and long-term environmental impacts.

ISO 45001, meanwhle, is the world’s international standard for occupational health and safety and is implemented alongside regional, national and industry-specific rules regarding workplace safety.

Invinity said that compliance with the three standards will accelerate its commercial development and growth in the energy storage market.

Exelon: historically strong grid reliability in 2021

Exelon, the largest utility in the US, said its customers experienced a year of historically strong electric service reliability as a result of investments in grid resiliency and highlighted the important future role of batteries.

The Fortune 100 company said the performance runs counter to the trend of decreasing reliability identified in a recent Associated Press study. Its targeted investments to make the electric grid more resilient to powerful storms includes battery energy storage.

It said the Beach Haven Battery Storage Project launched by its subsidiary Atlantic City Electric (ACE), which operates in New Jersey, will ease the strain of peak demand and provide backup power when it enters commercial operation in 2023. ACE customers experienced the lowest frequency of electric outages ever in 2021 and the frequency of outages has improved by 60% over the last 10 years.

Its five other utility subsidiaries also experienced record low levels of interruptions, record restoration times and lowest frequency of outages depending on the utility.

Read Next

August 29, 2025
The Australian government has opened two CIS tenders in Western Australia, targeting 2.4GWh of energy storage and 1.6GW of renewables.
Premium
August 28, 2025
Energy-Storage.news Premium speaks with Sergio Melendez, storage sector manager at CAISO, and Ali Karimian, market optimisation director at GridBeyond, about regulating Bid Cost Recovery Payments in the California Independent System Operator market.
August 28, 2025
California utility Pacific Gas and Electric (PG&E) has pushed back recommissioning of the Elkhorn battery energy storage system (BESS) by approximately one year, to 30 June 2026.
August 27, 2025
Three companies, Pacifico Energy, Zenith Volts, and Fermi America have begun expanding power generation and energy storage capabilities for US data centre development.
August 27, 2025
“Battery energy storage systems (BESS) typically change ownership between two and four times during their 40-year lifecycle,” John Sheehy, CEO of Pottinger, said on day two of the Battery Asset Management Summit Australia 2025 this morning.

Most Popular

Email Newsletter