Construction is underway on a 100MWh thermal energy storage project in Finland, using the same ‘Sand Battery’ technology as a 8MWh system which came online in 2022.
London Stock Exchange-listed Gore Street Energy Storage Fund (GSF) has secured a US$80 million increase in debt facilities for its battery storage projects.
System integrator NHOA Energy will provide Spanish transmission system operator (TSO) Red Eléctrica with 140MW/105MWh of BESS for two separate storage-as-transmission projects on the Balaeric Islands.
Steag subsidiary Iqony and Fluence will deploy a 50MW/200MWh BESS project in Germany, part of which will be contracted under a PPA with train network operator Deutsche Bahn.
Global decarbonisation targets are impossible without increasing the pace of long-duration energy storage (LDES) adoption 50 times over by 2040, according to the LDES Council.
Industry sources including ex-Fluence executives discuss what the next era for the rapidly-evolving BESS technology landscape looks like, including the move to AC blocks and changing battery cell sizes.