NV Energy’s transmission line-heavy IRP also includes large-scale solar-plus-storage

LinkedIn
Twitter
Reddit
Facebook
Email
Berkshire Hathaway-owned NV Energy’s IRP proposes a build-out of its grid network in addition to the 478MW of new solar PV parks and 338MW of battery energy storage. Image: NV Energy via Facebook.

Public utility NV Energy has announced plans to build three solar parks with battery storage and a large-scale transmission line project in Nevada, as it looks to transform the state’s clean energy landscape.

The solar-plus-storage projects, which form part of the utility’s Integrated Resource Plan filing, total 478MW of new solar photovoltaic generation and 338MW of battery storage. It is expected these will create more than 700 temporary jobs and be completed by the end of 2023.

Dry Lake is a 150MW photovoltaic project with a 100MW, four-hour battery storage system. Located 20 miles northeast of Las Vegas, it is being developed by NV Energy and will become its second and largest company-owned renewable project.

Planned for construction south of Boulder City, Boulder Solar III consists of a 128MW solar array and a 58MW, four-hour battery storage system. It is being developed by 174 Power Global and KOMIPO America.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Finally, Chuckwalla is a 200MW plant coupled with a 180MW, four-hour battery storage system, located 25 miles northeast of Las Vegas. EDF Renewables North America will develop the project.

NV Energy CEO Doug Cannon said: “These three projects represent NV Energy’s continued commitment to bring the benefits of low-cost solar energy and storage to our customers.”

As part of its IRP filing in Nevada, NV Energy is also seeking permission for a transmission line project called Greenlink Nevada that will consist of two distinct line segments.

If approved, the project is slated to begin in 2020 and support more than 4,000 jobs during its 11-year construction period.

“Nevada’s recently enhanced renewable portfolio standard calls for 50% of energy utilised in Nevada to come from renewable energy resources, and these transmission lines are timed in order to meet this mandate and to make significant advancements to meet the state’s 2050 carbon reduction objectives,” said Cannon.

“Our customers will reap the environmental and economic benefits of greater transmission capacity and increased renewable energy, including cleaner air, business growth, improved reliability and lower energy costs.”

The newly announced projects will be added to NV Energy’s current portfolio of 53 geothermal, solar, hydro, wind, biomass projects both in service and under development, including 2,191MW of new solar energy and nearly 700MW of battery energy storage systems.

This story first appeared on PV Tech.

15 September 2026
San Diego, USA
You can expect to meet and network with all the key industry players again in 2025 from major US asset owners, operators, RTOs and ISOs, optimizers, software and analytics providers, technical consultancies, O&M technology providers and more.

Read Next

May 22, 2026
Battery storage developer and operator Spearmint Energy has closed a US$450 million financing to support its 300MW/600MWh Red Egret battery energy storage system (BESS) project.
May 22, 2026
Long-duration energy storage (LDES) development and investment company Frontier Power USA (FPUSA) has acquired a 480MWh battery energy storage system (BESS) portfolio from developer-operator Bimergen Energy.
May 21, 2026
In this US news roundup, OCI Energy, MN8 Energy, GridStor, and Grenergy advance battery energy storage system (BESS) projects in Texas, California, Colorado, and Georgia.
May 20, 2026
Independent power producer (IPP) Sunraycer Renewables has closed a US$901 million project financing facility, supporting three solar-plus-storage projects in Texas, US.
Premium
May 20, 2026
Energy-Storage.news speaks with Moment Energy’s CTO and co-founder Gabriel Soares, and VP of business development, Carl Mansfield, about recent updates from the second life battery company.