Voltalia granted planning permission for 40MW UK solar project with energy storage

January 30, 2020
LinkedIn
Twitter
Reddit
Facebook
Email
Site layout plan for Voltalia’s UK project. Image: Pegasus Group.

French renewables company Voltalia has gained planning permission for a 40MW solar farm with battery storage in Dorset, England.

The South Farm site will include ground-mounted solar arrays and battery storage units. The power generated is to be fed into the grid, with the site to have a minimum lifespan of 35 years, after which it will be decommissioned unless further planning consent is granted.

Voltalia UK’s Simon Holt said the company was pleased to have hit this “milestone” and gained local support.

To read the full version of this story, visit Solar Power Portal.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Read Next

November 26, 2025
Potentia Energy has received federal environmental approval for its 1,000MWh Tallawang Solar Hybrid project, and Fluence has delivered its Gridstack battery energy storage equipment to Ampyr Australia’s 600MWh Bulabul Battery installation.
Premium
November 24, 2025
The low prices and strict operational requirements in Italy’s recent MACSE auction for BESS have brought asset management and operational execution into the spotlight.
November 21, 2025
In a major week for European BESS deal-making, project acquisition and financing deals have been done in the Poland, Germany, Finland, the UK and Romania for grid-scale projects totalling well over 1GW of capacity.
November 14, 2025
BESS and flexible generation provider Statera Energy has secured £235 million (US$309 million) in debt financing for its 680MW/1,360MWh Carrington BESS project in Manchester, UK.
November 13, 2025
Statkraft, Kyon Energy and Juniz Energy have progressed BESS projects in Germany, all in all totalling a combined 213MWh of capacity.