SonnenBatteries, V2G and EV smart chargers feature in UK’s first ‘combined grid service’ offering

LinkedIn
Twitter
Reddit
Facebook
Email
Special display unit ‘cutaway’ of a sonnen home energy storage system. Image: Andy Colthorpe / Solar Media.

“Intelligent energy platform” company Kaluza is claiming a UK first as it provides one of the country’s distribution network operators (DNOs) with flexibility from domestic batteries and transport solutions using one platform.

Electric vehicle (EV) smart charging and vehicle-to-grid (V2G) have been added into the flexibility service Kaluza’s provides to Western Power Distribution (WPD), with its platform already providing the DNO with flexibility using domestic battery storage systems from sonnen.

Kaluza lauded the milestone as the first time V2G has been used to provide flexibility to the local grid, as well as the first time a grid service has been provided using a mix of storage and transport devices.

Kaluza also hit a flexibility milestone with WPD in January as it utilised its sonnenBatteries in Lincolnshire to become the first residential flexibility platform to provide a paid service to a UK distribution network operator.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Its platform will now also shift EV charging away from times of high demand, while the combination of V2G and home batteries will be used to support WPD’s network with available export capacity during times of high demand.

Roger Hey, DSO systems and projects manager at WPD, said that the project “enables us to understand how all of these technologies will work together” whilst also bringing forward the “prospect of cleaner and cheaper energy” for consumers “in a way that can be replicated across the country”.

As part of the service Kaluza is providing to WPD, AI technology is utilised to provide a fully automated, machine-to-machine operation with no need for manual intervention.

To read the full version of this story, visit Current±.

8 September 2026
Barcelona, Spain
Battery & Energy Storage Tech Europe (BESTE) is Europe’s industrial scaling platform for stationary and industrial battery applications — not EVs. Taking place 8–9 September 2026 at Fira de Barcelona, BESTE brings together utilities, IPPs, energy-intensive industries, data centres, ports, rail, maritime, defence and aerospace OEMs — all deploying or integrating battery storage at scale. Over 100 companies already confirmed — including EDP Renewables, Acciona, Endesa, Naturgy, Neoen, Galp, Basquevolt and Veolia — alongside 40+ expert speakers and international institutional support from BEPA, BVES, LDES and Volta Foundation. Where Europe’s battery & ES ecosystem turns projects into reality.
15 September 2026
San Diego, USA
You can expect to meet and network with all the key industry players again in 2025 from major US asset owners, operators, RTOs and ISOs, optimizers, software and analytics providers, technical consultancies, O&M technology providers and more.

Read Next

June 22, 2026
South Australia’s SA1 trading region reached the NEM AU$20,300/MWh price cap twice during the evening of 21 June.
June 19, 2026
Long-duration energy storage (LDES) technologies are becoming increasingly viable options to add flexibility to the European electricity network, according to a new report.
June 19, 2026
Developer BLT Energy has received development approval for the 800MW/4,800MWh Red Gully BESS in Western Australia.
June 19, 2026
Energy storage developer Eku Energy has submitted two BESS, each sized at 300MW and 1,200MWh, for assessment under Australia’s EPBC Act.
June 18, 2026
Energy storage developer-operator Aypa Power and utility Salt River Project (SRP) have brought the 250MW/1,000MWh Pediment energy storage project online in Mesa, Arizona.