PODCAST: Global decarbonisation policy, Tesla Battery Day and huge solar manufacturing expansion

LinkedIn
Twitter
Reddit
Facebook
Email
Manufacturing capacity expansion plans of solar PV’s big players come into focus in the October Solar Media Podcast. Image: Trina Solar.

In this episode of the Solar Media Podcast, Liam Stoker and Andy Colthorpe take a deep dive into what Elon & Co. presented at Tesla’s Big Battery Day, assess what the recent spate of solar manufacturing expansion announcements mean for the sector, and discuss the current state of energy politics.

The podcast can be streamed below:

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Alternatively, you can subscribe and listen to the podcast on the Solar Media Editor’s Channel, which is now on all popular audio channels, including;

Apple Podcasts
Spotify
Google Podcasts

Read Next

June 15, 2026
APAC’s AI data centres look set to lock in a decade of coal and gas dependency, but long-duration energy storage can break that cycle, says Pavina Adunratanasee of ArkTerra Partners.
June 12, 2026
RWE Renewables Australia has officially opened the 50MW/400MWh Limondale battery energy storage system (BESS) near Balranald in south-west New South Wales.
June 11, 2026
IPP Greenvolt has put a 99.8MW/288.6MWh BESS into commercial operation in Hungary, the largest in the country, while pipelines and projects have been progressed in Italy, France, Netherlands, Belgium and Spain.
June 11, 2026
Carrie Xiao reports back from this year’s edition of SNEC in Shanghai, China, the world’s biggest solar and energy storage expo.
June 10, 2026
The president of Chile, José Antonio Kast Rist, was in attendance as IPP Grenergy inaugurated a 3.5GWh battery energy storage system (BESS).