PODCAST: COVID-19 and its impact on the global energy storage sector

By Liam Stoker, Andy Colthorpe
April 8, 2020
LinkedIn
Twitter
Reddit
Facebook
Email
A completed project of Gore Street Capital's, a UK listed fund which has postponed all construction work on its pipeline for the time being. Image: Gore Street Capital.

The latest episode of the Solar Media Podcast is now available to stream, featuring considerable discussion around the ongoing COVID-19 pandemic and its impact on the energy storage sector.

In April’s pod, Andy Colthorpe and Liam Stoker explore how the pandemic is causing delays to energy storage projects in the US and Europe and a forecasted slowdown in technology cost reductions.

The podcast can be streamed below:

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Alternatively, you can subscribe and listen to the podcast on the Solar Media Editor’s Channel, which is now on all popular audio channels, including;

13 October 2026
London, UK
Now in its second edition, the Summit provides a dedicated platform for UK & Ireland’s BESS community to share practical insights on performance, degradation, safety, market design and optimisation strategies. As storage deployment accelerates towards 2030 targets, attendees gain the tools needed to enhance returns and operate resilient, efficient assets.

Read Next

April 15, 2026
Australian mining giant Fortescue has accelerated its timeline for deploying 4-5GWh of battery energy storage systems (BESS) paired with 1.8GW of renewable energy generation, which it now expects to begin commercial operation by 2028.
Premium
April 14, 2026
Over 1.4GW/3.4GWh of grid-scale BESS came online in Europe, likely its best month ever, accounting for almost a fifth of global figures.
Premium
April 13, 2026
We catch up with Tamara de Gruyter, president of Wärtsilä Energy Storage, to discuss the system integrator’s strategy under new leadership.
April 13, 2026
Energy storage firm Guoxia Technology (02655.HK) has released its first full annual report since listing on the Hong Kong Stock Exchange late last year.  
April 9, 2026
Gridstor and Axpo have executed an energy storage revenue swap agreement for a 220MW/440MWh BESS in Galveston County, Texas.