Flow battery technology milestones from PNNL and Sumitomo Electric

LinkedIn
Twitter
Reddit
Facebook
Email

A seven-year observation of a vanadium flow battery in California from Sumitomo Electric has been completed, while US lab PNNL has found an alternative, food-based electrolyte which it said boosted capacity and longevity.

Results from vanadium redox flow project in California

The first is the results of a seven-year long observation of a 2MW/8MWh vanadium redox flow battery (VRFB) system that Japan-based Sumitomo Electric deployed at a site in California, in partnership with utility SDG&E.

Energy-Storage.news reported on the project back in 2017, which sought to show how the technology can reliable help the grid integrate renewables and improve flexibility, and the research has shown high long-term operating rates and capacity retention rates.

The ex-post evaluation by external experts was concluded in December 2022 with a results presentation and tour of the site in February earlier this year (viewable on Youtube), but Sumitomo only announced the completion publicly last week (7 July).

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

The external experts gave high marks on the four evaluation items with “many positive comments”, Sumitomo said, outlined in the table below. Much of the comments and research relates to the suitability of the technology for use in Japan.

“The knowledge obtained through this demonstration project will be particularly useful in forming an electricity market in Japan and creating a system for its operation, and it will serve as a basis for promoting and achieving decarbonisation in Japan,” said one expert comment.

“Technically, it is extremely significant that the storage battery system showed a high operating rate (99% in the final year of the project) and durability (a capacity retention rate of 90% or more for 20-years) in the actual electricity market.”

The project was part-funded by Japan’s New Energy and Industrial Technology Development Organization (NEDO) and the California Governor’s Office of Business and Economic Development (GO-Biz).

Pacific Northwest National Laboratory (PNNL) finds vanadium-alternative in ‘record-breaking experiment’

Sumitomo’s technology uses vanadium as an electrolyte, as most redox flow battery companies do.

However, US national lab PNNL said this week that it found a common food and medicine additive alternative that can “…boost the capacity and longevity of a next-generation flow battery design in a record-setting experiment”. The study was published in journal Joule.

The lab said the flow battery project maintained its capacity to store and release energy for more than a year of continuous charge and discharge, using a simple sugar derivative called β-cyclodextrin. Use of the derivative of starch boost the battery’s longevity and capacity.

The scientists optimised the ratio of chemicals in the system until it achieved 60% more peak power.

Then, they cycled the battery continuously for over a year, only stopping the experiment when the plastic tubing failed. During this time, the flow battery “barely lost any of its activity to recharge”.

PNNL claimed it is the first laboratory-scale flow battery experiment to report minimal loss of capacity after a year of continuous use.

Read Next

September 18, 2026
In this US news roundup, Eos has received an advance on its DOE loan, FlexGen and Lighshift have partnered on 16 BESS projects, and Georgia Power has energised a 128MW BESS.
September 18, 2026
US battery energy storage system (BESS) developer-operator Jupiter Power has closed a US$1.4 billion financing, supporting 10 US BESS projects totalling 3,600MWh of capacity.
September 18, 2026
The US has pledged financial support towards an existing 400MWh battery energy storage system (BESS) portfolio in Ukraine.
Premium
September 17, 2026
Energy-Storage.news Premium speaks with Randolph Mann, CEO at developer esVolta at the 2026 US Battery Asset Management Summit in Garden Grove, California.
September 17, 2026
The transition of battery energy storage systems (BESS) from development to operations remains fraught with technical gaps and communication breakdowns.