
Building BESS is complicated, with myriad considerations around supplier contracts, site acceptance tests, data analysis, interface between different contractors to factor in.
The ‘Lessons Learned from BESS Construction Projects’ panel discussion at the Energy Storage Summit 2026 in London in February dived into all of that and more, featuring:
- Andy Colthorpe, Editor – Energy-Storage.news, Solar Media
- Steven Xuereb, Executive Director, Kiwa
- Kai-Philipp Kairies, CEO, ACCURE Battery Intelligence
- Gili Almagor, Director of Energy Storage, Nofar Energy
The Summit is the flagship event in our publisher Solar Media’s series of energy storage-focused events globally, which now totals 16, all of which you can learn more about here. We’ve already posted several sessions from the event and will continue to post more in the coming weeks.
This article requires Premium SubscriptionBasic (FREE) Subscription
Already a subscriber? Sign In
Try Premium for just $1
- Full premium access for the first month at only $1
- Converts to an annual rate after 30 days unless cancelled
- Cancel anytime during the trial period
Premium Benefits
- Expert industry analysis and interviews
- Digital access to PV Tech Power journal
- Exclusive event discounts
Or get the full Premium subscription right away
Or continue reading this article for free
See the full video of the panel discussion on construction below, and all the ones posted so far here.