DESRI, Clearway move Texas BESS projects forward

February 24, 2026
LinkedIn
Twitter
Reddit
Facebook
Email

DESRI supports Linea Energy’s 470MWh Texas BESS

D. E. Shaw Renewable Investments (DESRI) has signed a preferred equity investment in IPP Linea Energy’s 235MW/470MWh Duffy battery energy storage system (BESS) in Matagorda County, Texas.

The Duffy BESS debt financing includes a construction-to-term loan, a tax equity bridge loan, and a letter of credit facility. Norddeutsche Landesbank Girozentrale (NORD/LB) acted as the coordinating lead arranger, while Societe Generale and SMBC served as joint lead arrangers.

In June 2025, DESRI began construction on the 205MW/1,000MWh Cattclaw solar-plus-storage project in Arizona.

The company bought the Catclaw solar and storage project in Buckeye, Arizona, from US solar developer Avantus in 2024. The site features a 250MW, 4-hour duration BESS and is expected to begin operations this year.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Catclaw has a 20-year power purchase agreement (PPA) in place with utility APS, the Arizona Public Service.

In July 2025, DESRI began construction on the 150MW solar and 600MWh BESS Sata Tera Solar and Storage Project in New Mexico. The BESS will be manufactured and supplied by LG Energy Solution (LG ES), one of the first movers in bringing US-based production capacity for lithium iron phosphate (LFP) BESS cells online.

SOLV Energy will act as the engineering, procurement and construction (EPC)contractor for the project, while LG ES’ system integrator subsidiary LG Energy Solution Vertech will supply US-made BESS systems and its AEROS software suite under a long-term service agreement (LTSA).

Clearway brings solar-plus-storage project online in Texas

IPP Clearway Energy Group has brought online the solar-plus-BESS Pine Forest Energy Centre in Hopkins County, Texas.

The Pine Forest project includes 300MW solar PV and 200MW BESS capacity. Clearway says the project represents a US$685 million investment in “reliable, low-cost” energy.

Clearway also claimed that the project’s construction created approximately 480 jobs and was led by renewables contractor Blattner Energy. Blattner is also contracted with Clearway on solar and storage projects in California, for which the IPP closed a US$700 million construction financing in 2024.

Pine Forest is supported by long-term virtual power purchase agreements with Dell Technologies and Universal Corporation. In 2024, Clearway Energy committed to investing in the project once it becomes commercially operational.

Over the next two decades, Pine Forest is projected to produce over US$58 million in property tax revenue, benefiting local schools, emergency services, and infrastructure.

Clearway and Blattner emphasised their involvement with the Pine Forest community, mentioning contributions to local schools and families in need.

The companies supported teacher appreciation events at the Como-Pickton Consolidated Independent School District, contributed appliances and enhancements to the Pine Forest Community Centre, and participated in initiatives to provide holiday gifts for over 130 children. Additionally, Clearway and its partners donated US$3,500 and several hundred pounds of food to the Pine Forest Food Bank.

In April 2025, AIP Management agreed to purchase a 49.99% equity stake in Pine Forest from Clearway. The investor announced that it would acquire this stake with a total investment of about US$200 million.

The BESS part of the project will be utilised to participate in the Electric Reliability Council of Texas (ERCOT) wholesale energy and ancillary services market.

AIP has also shared equity with Clearway in other BESS projects, including the 186MW/744MWh Lorax BESS in Riverside County, California.

Clearway owns 40% of this project, while AIP holds the remaining 60%. This project is also co-located with solar PV facilities, which seem to be operational. According to AIP’s website, the BESS was expected to start commercial operation in 2024; however, there is no recent update on its progress.

The Energy Storage Summit USA will be held from 24-25 March 2026, in Dallas, TX. It features keynote speeches and panel discussions on topics like FEOC challenges, power demand forecasting, and managing the BESS supply chain. ESN Premium subscribers can get an exclusive discount on ticket pricesFor complete information, visit the Energy Storage Summit USA website.

24 March 2026
Dallas, Texas
SolarPLUS USA brings together the developers, investors, utilities, and system operators shaping the next phase of America’s clean energy build-out. As solar, storage, and hybrid technologies rapidly converge, the Summit provides a focused platform to tackle grid constraints, revenue optimisation, project financing, and the commercial models defining firm, flexible renewable power. Join us to explore the opportunities and challenges driving the Solar+ era across the US market.
24 March 2026
Dallas, Texas
The Energy Storage Summit USA is the only place where you are guaranteed to meet all the most important investors, developers, IPPs, RTOs and ISOs, policymakers, utilities, energy buyers, service providers, consultancies and technology providers in one room, to ensure that your deals get done as efficiently as possible. Book your ticket today to join us in 2026!
15 April 2026
Milan Marriott Hotel, Italy
Solarplus Europe 2026 marks the evolution of Europe’s longest-running solar conference, reflecting the industry’s transition from standalone PV to fully integrated solar-plus-storage and hybrid energy systems. Taking place in Milan, the Summit will unite developers, investors, policymakers, and technology leaders to explore how Europe can deliver firm, flexible, and bankable renewable power at scale. With a sharp focus on system integration, storage deployment, hybrid project design, and market-ready business models, Solarplus Europe provides the platform for shaping the next phase of the continent’s solar and clean power build-out.
9 June 2026
Stuttgart, Germany
Held alongside The Battery Show Europe, Energy Storage Summit provides a focused platform to understand the policies, revenue models and deployment conditions shaping Germany’s utility-scale storage boom. With contributions from TSOs, banks, developers and optimisers, the Summit explores regulation, merchant strategies, financing, grid tariffs and project delivery in a market forecast to integrate 24GW of storage by 2037.
15 September 2026
San Diego, USA
You can expect to meet and network with all the key industry players again in 2025 from major US asset owners, operators, RTOs and ISOs, optimizers, software and analytics providers, technical consultancies, O&M technology providers and more.
15 September 2026
Berlin, Germany
Launching September 2026 in Berlin, Energy Storage Summit Germany is a new standalone event dedicated to Germany’s energy storage market. Bringing together investors, developers, policymakers, TSOs, manufacturers and optimisation specialists, the Summit explores the regulatory shifts, revenue models, financing strategies and technology innovations shaping large-scale deployment. With Germany targeting 80% renewables by 2030, it offers a focused platform to connect with the decision-makers driving the Energiewende and the future of utility-scale storage.

Read Next

February 25, 2026
Experts at the ongoing Energy Storage Summit 2026 have cautioned against treating co-located storage as a “silver bullet” to prop up commercially underperforming solar assets.
February 25, 2026
In this Energy-Storage.news roundup, FlexGen updates its EMS, LandGate launches a BESS site selection tool, ON.energy and Shoals target AI data centres, and Sunrun has a successful season of dispatching energy with PG&E.
Premium
February 25, 2026
In an interview with Energy-Storage.news Premium, Jay Jayasuriya, Principal at Sendero Consulting, argues that AI data centres are “convenient scapegoats” for grid failures
February 25, 2026
RE Development Pty Ltd has submitted a development application for a 250MW/1,000MWh battery energy storage system (BESS) in Baldivis, Western Australia.
February 25, 2026
Akaysha Energy has confirmed that the replacement transformer for Australia’s 850MW Waratah Super Battery will be delivered in Q3 2026.