Energy Vault closes US$18 million financing for 114MWh Texas BESS

LinkedIn
Twitter
Reddit
Facebook
Email

Energy storage developer and system integrator Energy Vault has successfully closed a US$18 million financing for its Cross Trails battery energy storage system (BESS) project in Scurry County, Texas, US.

Additionally, the company anticipates receiving over US$12 million in investment tax credit (ITC) funds later this quarter through a previously agreed ITC sale agreement.

The 57 MW/114 MWh BESS was brought to commercial operation in June, ahead of schedule. It has a 10-year offtake agreement with optimiser Gridmatic, which is also providing qualified scheduling entity (QSE) services.

Energy Vault’s deal with Gridmatic is supported by Gridmatic’s Energy Storage Fund, a US$50 million fund established in 2023 to oversee up to 500MW of battery capacity in the Electric Reliability Council of Texas (ERCOT) and California Independent System Operator (CAISO) markets.

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

Cross Trails marks Energy Vault’s first deployment of its second-generation UL9540-certified B-Vault AC and DC-coupled solution, featuring its energy management system (EMS), VaultOS. Energy Vault will also use the B-Vault solution in a 200MWh Texas project with developer Jupiter Power.

In April, Energy Vault closed on US$28 million in project financing for the Calistoga Resiliency Centre (CRC) located in California.

Notably, that financing also included the sale of an ITC associated with the CRC.

CRC integrates hydrogen fuel cells with a lithium-ion BESS, specifically crafted to ensure power resilience during grid disconnections caused by wildfires or other natural events disasters.

The CRC enables the Calistoga community microgrid to stay powered during shutoffs or disconnections. Energy Vault states that its 293MWh system provides around 48 hours of continuous energy, with a peak output of 8.5 MW during public safety power shutoff (PSPS) events.

In March, Energy Vault acquired the 125MW/1GWh Stoney Creek BESS in New South Wales, Australia, from Enervest Group. The amount paid for the project was undisclosed.

Robert Piconi, Chairman and CEO of Energy Vault, noted that these recent projects are part of the company’s ‘Own & Operate’ strategy, which it launched in 2024 with a “long-term vision for generating predictable, recurring and high margin tolling revenue streams with the goal of delivering sustainable, long-term value to shareholders.”

11 November 2025
San Diego, USA
The 2024 Summit included innovative new features including a ‘Crash Course in Battery Asset Management’, Ask-Me-Anything formats and debate-style sessions. You can expect to meet and network with all the key industry players again in 2025 from major US asset owners, operators, RTOs and ISOs, optimizers, software and analytics providers, technical consultancies, O&M technology providers and more.

Read Next

July 31, 2025
US zinc battery and energy storage system maker Eos Energy Enterprises has reported year-on-year revenue growth of 243% from the first half of 2024.
July 31, 2025
Clean energy owner-operators Apex Clean Energy and esVolta have commissioned and put into commercial operation BESS projects in the ERCOT, Texas market, while second life BESS firm B2U has started building one in the state.
July 31, 2025
Tesla’s Shane Bannister revealed that he doesn’t think Tesla will sell another battery in Australia that’s not grid-forming.
Premium
July 30, 2025
Energy-Storage.news Premium speaks with Sean McEvoy, President of North America at GridBeyond, following its optimisation of Gore Street Energy Storage Fund’s (GSF) Big Rock energy storage project.
July 30, 2025
Australia’s minister for climate change and energy, Chris Bowen, has confirmed that the Capacity Investment Scheme (CIS) will be upsized from 32GW to 40GW.

Most Popular

Email Newsletter