AES to install largest battery-based energy storage project in US for SDG&E

August 19, 2016
LinkedIn
Twitter
Reddit
Facebook
Email

AES will deploy its Advancion 4 storage systems at two SDG&E substations in San Diego County, California, with 30MW in Escondido and 7.5MW in El Cajon. Credit: AES
US-based storage provider AES Energy Storage, a subsidiary of AES Corporation, has signed contracts with utility San Diego Gas and Electric (SDG&E) to install two energy storage arrays with a combined capacity of 37.5MW.

AES will deploy its Advancion 4 storage systems at two SDG&E substations in San Diego County, California, with 30MW in Escondido and 7.5MW in El Cajon. They will help the utility improve regional reliability and integrate more renewable energy. The Advancion arrays will be able to provide 37.5 MW of power for four continuous hours and serve as a 75 MW of flexible resource to the grid.

The systems will include batteries by Samsung SDI and power conversion systems by Parker Hannifin.

The projects will become operational by the end of January 2017 and the Escondido array will be the largest battery-based energy storage project in operation in the US, according to AES.

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

Not ready to commit yet?
  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

The utility is trying to accelerate its uptake of energy storage with support from the California Public Utilities Commission (CPUC).

Andrés Gluski, AES president and chief executive, said: “We are excited that SDG&E has selected AES’ Advancion energy storage solution to help meet peak demand and ensure the reliability of the electric grid in Southern California. AES recently made Advancion available to utilities, developers and commercial customers interested in owning our innovative and scalable solution.”

James Avery, SDG&E’s chief development officer, said: “These batteries are beneficial because they maintain a reliable flow of energy to customers when they need it most. We also are national leaders in supplying renewable resources, with more than 33% of the energy we supply to customers coming from wind and solar. These batteries will help smoothly integrate this growing supply of clean energy onto the power grid for use by our customers.”

AES Energy Storage recently made significant expansions away from established markets into relatively untapped regions across the globe.

Read Next

Premium
October 24, 2025
San Diego Gas & Electric (SDG&E) is seeking regulatory approval to acquire an operational portion of a BESS facility located in Imperial County, California, from the US development arm of German multinational energy company RWE. 
Premium
October 23, 2025
With the final deadline for this year’s California legislative session having passed, now is a good time to analyse the outcomes of several bills that were first introduced earlier this year pertaining to BESS.
Premium
October 16, 2025
Utility-scale developer SB Energy has received a US$25 million grant from the California Energy Commission (CEC) to purchase BESS units for one of its solar and storage hybrid complexes located in Riverside County, California. 
October 2, 2025
Major US utility company Duke Energy has filed its biennial long-range energy modernisation plan for North and South Carolina, US. The plan includes a 5,600MW battery storage target.
September 30, 2025
According to the Q3 2025 US Energy Storage Monitor from Wood Mackenzie Power & Renewables and the American Clean Power Association (ACP), annual installations will not reach 2025 levels again until 2029.

Most Popular

Email Newsletter