Virginia’s 100% renewables by 2050, 3.1GW of energy storage by 2035 goals look good to go

LinkedIn
Twitter
Reddit
Facebook
Email
Governor Ralph Northam is more than likely to sign off on the bills – given that he was their instigator. Image: Flickr user Sabreguy.

While it still needs a signature from Governor Ralph Northam, the US Commonwealth of Virginia’s bicameral lawmaking body has finally passed a version of a recent clean energy – and economy – bill that has proven acceptable to both sides of the house.

The finalised, much-amended bill can be viewed here, setting out the technical and policy conditions by which Virginia can reach Governor Northam’s proposed goal of 100% renewables by 2050. This includes peak shaving programmes; support for rooftop solar and for wind energy; coal phase-out mandates for utilities Dominion Energy and American Electric Power, which have held sway in the energy mix until now; and a 3,100MW energy storage deployment target by 2035 (with 2,700MW for Dominion and 400MW for AEP).

To read the full version of this story, visit PV Tech.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

15 September 2026
San Diego, USA
You can expect to meet and network with all the key industry players again in 2025 from major US asset owners, operators, RTOs and ISOs, optimizers, software and analytics providers, technical consultancies, O&M technology providers and more.

Read Next

July 20, 2026
Residential renewable energy solutions company Palmetto recently launched its Palmetto Energy Backup Plan, a residential battery subscription aimed at making residential storage more accessible in 25 US states.
July 17, 2026
Battery energy storage systems (BESS) operating in California’s grid left approximately US$98 million on the table due to suboptimal bidding strategies, according to a new analysis from Gridmatic.
July 17, 2026
Zinc hybrid cathode battery and storage system maker Eos Energy Enterprises has announced a strategic partnership with the US Department of Defense (DoD) to “enhance the resilience of national defence infrastructure.”
July 17, 2026
A subsidiary of Indian renewable energy equipment and component manufacturer Waaree Energies has opened a battery energy storage system (BESS) enclosure factory.
July 16, 2026
Distributed energy resource (DER)-focused companies Sunrun and FranklinWH are expanding in California and Texas, US, respectively.