VIDEO: Europe’s first 100GW of energy storage and what’s next, with Energy Storage Europe

March 16, 2026
LinkedIn
Twitter
Reddit
Facebook
Email

We hear about the progress made and challenges ahead at the policy level from Jacopo Tosoni of the trade association Energy Storage Europe.

The Energy Storage Europe deputy secretary general and head of policy offers perspectives on everything from the 100GW of cumulative installations—comprising around half-and-half lithium-ion battery energy storage systems (BESS) and pumped hydro—that was reached in late 2025, to the first leak of European Union (EU) plans to encourage higher levels of domestic content in deployment and manufacturing.

Our conversation spanned a breadth of other topics, including the drivers for industrial decarbonisation and long-duration energy storage (LDES) and why 1 July 2026 is an important date to mark the progress made (or not) by EU Member States in implementing their energy storage targets and system flexibility assessments under Electricity Market Design reforms.

Jacopo Tosoni met with Energy-Storage.news editor Andy Colthorpe for a video interview at this year’s Energy Storage Summit 2026 in February, hosted by our publisher Solar Media (part of the Informa Group).

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

9 June 2026
Stuttgart, Germany
Held alongside The Battery Show Europe, Energy Storage Summit provides a focused platform to understand the policies, revenue models and deployment conditions shaping Germany’s utility-scale storage boom. With contributions from TSOs, banks, developers and optimisers, the Summit explores regulation, merchant strategies, financing, grid tariffs and project delivery in a market forecast to integrate 24GW of storage by 2037.
2 December 2026
Italy
Battery Asset Management Summit Europe is the annual meeting for owners, operators, investors, and optimisation specialists working with operational BESS assets across the continent. The Summit focuses on how to maximise performance and revenue, manage degradation, integrate advanced optimisation software, navigate evolving market and regulatory frameworks, and plan for repowering or end-of-life strategies. With insights from Europe’s most active storage markets, it equips attendees with practical guidance to run resilient, profitable battery portfolios as the sector scales.

Read Next