Uniper signs 5GWh conditional supply agreement for CMBlu’s organic flow batteries

February 3, 2026
LinkedIn
Twitter
Reddit
Facebook
Email

German power firm Uniper has entered into a conditional supply contract with organic solid flow battery company CMBlu Energy for the delivery of at least 5GWh of its technology.

The long-term framework agreement runs until 2037 and gives Uniper the option to take delivery of battery systems from CMBlu in tranches of at least 100MWh each, starting in 2027.

It follows a site acceptance test (SAT) of CMBlu’s battery system by Uniper. Both companies are headquartered in Germany.

CMBlu’s SolidFlow battery is based on the unique and patented combination of organic redox flow technology with solid-state storage materials and is specifically designed for market-driven use in the multi-hour range, the company said.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

It claims high cycle stability, a lifespan of several decades and non-flammable electrolytes. It also benefits from the absence of critical raw materials such as lithium, cobalt, or nickel, as with most other non-lithium-based battery technologies.

Uniper first announced plans to pilot CMBlu’s tech at a project in Germany back in 2023. It has also tested other flow battery technologies, including that of Dutch firm Elestor, announced the previous year in 2022. It has also looked at the economic feasibility of large-scale green hydrogen storage, winning a small grant from the EU for a project the same year.

Uniper is a spinout of the larger German-headquartered utility and power firm E.ON.

While the firms didn’t which countries they were targeting for deployments, both are headquartered in Germany so the first projects may well be there.

If so that could represent a shift in appetite for the technology. In 2022, a flow battery executive speaking anonymously lamented that the country’s energy sector ‘did not think it needed flow batteries’, instead believing that a combination of lithium-ion for short-duration and green hydrogen for long-duration would suffice.

However, since then the green hydrogen sector has struggled to scale. Perhaps in related developments, flow batteries appear to have become more viable for large-scale projects. In that time, a flow battery firm VoltStorage raised a €30 million venture loan, a 10MWh project has been completed, and power firm LEAG seriously considered building a 500MWh project using iron flow batteries from ESS Inc.

As well as Europe, CMBlu is also active in the US market. We recently caught up with its North America president Giovanni Damato for an interview on ESN Premium.

Energy-Storage.news publisher Solar Media is hosting the Energy Storage Summit EU 2026 in London, UK, on 24-25 February 2026 at the InterContinental London – The O2. ESN Premium subscribers can get exclusive discounts on ticket prices. See the official website for more details, including agenda and speaker lists.

24 February 2026
InterContinental London - The O2, London, UK
This isn’t just another summit – it’s our biggest and most exhilarating Summit yet! Picture this: immersive workshop spaces where ideas come to life, dedicated industry working groups igniting innovation, live podcasts sparking lively discussions, hard-hitting keynotes that will leave you inspired, and an abundance of networking opportunities that will take your connections to new heights!
9 June 2026
Stuttgart, Germany
Held alongside The Battery Show Europe, Energy Storage Summit provides a focused platform to understand the policies, revenue models and deployment conditions shaping Germany’s utility-scale storage boom. With contributions from TSOs, banks, developers and optimisers, the Summit explores regulation, merchant strategies, financing, grid tariffs and project delivery in a market forecast to integrate 24GW of storage by 2037.
15 September 2026
Berlin, Germany
Launching September 2026 in Berlin, Energy Storage Summit Germany is a new standalone event dedicated to Germany’s energy storage market. Bringing together investors, developers, policymakers, TSOs, manufacturers and optimisation specialists, the Summit explores the regulatory shifts, revenue models, financing strategies and technology innovations shaping large-scale deployment. With Germany targeting 80% renewables by 2030, it offers a focused platform to connect with the decision-makers driving the Energiewende and the future of utility-scale storage.
2 December 2026
Italy
Battery Asset Management Summit Europe is the annual meeting for owners, operators, investors, and optimisation specialists working with operational BESS assets across the continent. The Summit focuses on how to maximise performance and revenue, manage degradation, integrate advanced optimisation software, navigate evolving market and regulatory frameworks, and plan for repowering or end-of-life strategies. With insights from Europe’s most active storage markets, it equips attendees with practical guidance to run resilient, profitable battery portfolios as the sector scales.

Read Next

February 23, 2026
European Union countries have made limited progress on energy storage deployment and electricity network flexibility recommendations.
February 23, 2026
Operational experience, credibility and optimisation performance are becoming key to BESS bankability, writes Jürgen Mayerhofer, CEO and co-founder of optimiser Enspired.
February 20, 2026
A flurry of BESS project news from big-name players in Western Europe in the run-up to the Energy Storage Summit next week, with Neoen, Statkraft, Zenobē and Infranode moving projects forward in Germany, Ireland, the UK and Denmark. Highlights include a 15-year toll between Drax and Zenobē, and multiple 4-hour duration systems.
February 20, 2026
Recent developments from India’s emerging energy storage sector highlight a broadening of interest in diverse technologies and applications.
February 19, 2026
A team from Open Energy Transition discusses the benefits of open energy system modelling in assessing resources, including energy storage of varying durations.