UK’s Ofgem goes big on LDES cap-and-floor window 1; 18-hour lithium-ion among winners
UK energy regulator Ofgem has shortlisted 16 projects for the first ever long-duration energy storage (LDES) cap-and-floor scheme, totalling 7.6GW of capacity ranging from 8- to 22-hour durations.
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed