Search Results for: "energy storage summit" – Page 13

April 4, 2025
A 10MW/10MWh battery storage system at a wind park in the Netherlands has been relocated to a new site as part of a repowering project.
April 4, 2025
Queensland achieved a new battery discharge record on 30 March 2025, with a maximum instantaneous battery discharge of 474.1MW at 17:55.
April 3, 2025
With Australia’s federal election set for 3 May 2025, Energy-Storage.news delves into how energy storage could be impacted.
April 2, 2025
The system integration arm of SMA Solar and utility RheinEnergie have partnered to deploy BESS projects in Germany, with construction about to launch on the first.
April 2, 2025
ESN Premium hears from Tom Best, COO at Eku Energy, what it takes to comply with Australia’s Generator Performance Standards.
April 1, 2025
Sharon Santhosh, energy storage applications engineer at Wärtsilä, talks all things BESS noise, including enclosure design, the various mitigating measures engineers can implement, and implications of BESS technology developments further down the line.
April 1, 2025
Allegro Energy has revealed what it claims is Australia’s first locally manufactured microemulsion flow battery (MeFB) suited for LDES.
April 1, 2025
A total of 11.9GW of energy storage across all scales and technologies was installed in Europe in 2024, bringing cumulative installations to 89GW.
March 28, 2025
Suitable energy storage project sites are quickly being snapped up in Australia’s National Electricity Market (NEM), with a premium on grid location.  
March 28, 2025
BloombergNEF (BNEF) has found that utility-scale BESS uptake in Australia could increase eightfold to 18GW in 2035, up from 2.3GW in 2024.

Email Newsletter

Most Popular

Upcoming Events

September 16
 - September 17
, 2025
Athens, Greece
September 22
 - September 26
, 2025
Bilbao, Spain
September 23
 - September 24
, 2025
Warsaw, Poland