Zenobe Energy set to enter new 10MW battery in UK’s Balancing Mechanism

By Alice Grundy
September 21, 2020
LinkedIn
Twitter
Reddit
Facebook
Email
Zenobe’s 10MW battery at the Hill Farm site. Image: Zenobe Energy.

As part of an optimisation deal with Open Energi and Erova Energy, battery storage owner and operator Zenobe Energy is set to enter a new battery into the UK’s Balancing Mechanism (BM).

The Dynamic Demand 2.0 Trader solution – developed by Open Energi and Erova – is to be used to optimise the site, with the system algorithmically taking positions and rebalancing state of charge by making continuous calculations over different time horizons as market opportunities evolve.

This is being lauded as the country’s first fully automated energy optimisation and trading system, and will utilise Zenobe’s 10MW battery at the Hill Farm site.

It is also to provide the company’s battery with access to BM revenues for the first time, with the battery also trading in the wholesale, ancillary service and capacity markets.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

David Hill, commercial director at Open Energi, said: “We are really excited to build on our existing relationship with Zenobe to deploy our flagship grid-scale battery storage product, Dynamic Demand 2.0 Trader with Erova Energy for the first time.

“We believe that our proven track record in trading performance and managing complex warranties with our State of Charge management software will lend itself well to trading in the Balancing Mechanism, where optimisation strategies hinge on energy recovery ability.”

National Grid ESO has been working to open up the BM, through a number of measures including introducing a new interface. Additionally, independent aggregators can now access the mechanism as Virtual Lead Parties (VLPs), and Elexon is considering allowing individual asset meters to be used for settlement purposes, resulting in “more opportunities” for small asset owners.

A number of new assets have been introduced to the BM in recent months, including ones owned by Gresham House Energy Storage Fund, as well as companies such as Flexitricity and Habitat Energy entering the BM as VLPs.

Steven Meersman, co-founder at Zenobe Energy, said: “We are very happy to continue to build on the great work done to date with Open Energi and extend our joint reach into the Balancing Mechanism as well as wholesale traded markets by including Erova into the partnership.”

This article was originally published on ESN’s sister site Current±

15 September 2026
San Diego, USA
You can expect to meet and network with all the key industry players again in 2025 from major US asset owners, operators, RTOs and ISOs, optimizers, software and analytics providers, technical consultancies, O&M technology providers and more.
13 October 2026
London, UK
Now in its second edition, the Summit provides a dedicated platform for UK & Ireland’s BESS community to share practical insights on performance, degradation, safety, market design and optimisation strategies. As storage deployment accelerates towards 2030 targets, attendees gain the tools needed to enhance returns and operate resilient, efficient assets.

Read Next

Premium
February 27, 2026
We caught up with the CEO of owner-operator BW ESS, Erik Strømsø, about the firm’s next deployment plans, tolling trends, procurement and LDES, with its 11.5-hour Bannaby BESS in Australia further proof of lithium-ion’s long-duration potential.
February 25, 2026
RE Development Pty Ltd has submitted a development application for a 250MW/1,000MWh battery energy storage system (BESS) in Baldivis, Western Australia.
February 25, 2026
The 200MW/400MWh New England battery energy storage system (BESS) in New South Wales has registered with the Australian Energy Market Operator’s (AEMO) Market Management System (MMS).
February 24, 2026
Panellists discussed M&A in large-scale BESS on the ‘M&A Market: How Attractive Is BESS Right Now?’ panel discussion at the Energy Storage Summit 2026.
February 24, 2026
How to enable bankability for large-scale BESS projects was the main topic of the opening panel discussion at the Energy Storage Summit 2026 which kicked off today (24 February).