EDF signs PPAs for huge California solar-plus-storage project

LinkedIn
Twitter
Reddit
Facebook
Email
EDF’s 49MW West Burton battery project in England. Image: EDF.

Two community energy suppliers in California followed up an agreement to buy power from a large-scale solar-plus-storage farm with another, project developer EDF Renewables has announced.

Energy-Storage.news reported at the end of October that Monterey Bay Community Energy (MBCE) and Silicon Valley Clean Energy (SCVE) had agreed 15-year power purchase agreements (PPAs) with Recurrent Energy, the US developer owned by Canadian Solar.

Through that deal, MBCE and SCVE will buy 45% and 55% respectively of output from Slate, a 150MW solar farm in Kern County, paired with 45MW / 150MWh of lithium battery storage which enables four hours of dispatchable solar energy, helping mitigate late afternoon and evening peaks in demand as solar production tails off.

At around the same time, but not announced by EDF Renewables until a few days ago, the pair also brokered a PPA deal with EDF Renewables, the international clean energy development arm of European utility company EDF, again for a Kern County solar project.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Big Beau Solar + Storage Project is 40MW / 160MWh of battery energy storage and 40MW of solar generation capacity, expected to reach commercial operation by the end of 2021. SVCE and MBCE will once again buy 55% and 45% of the power each in the same split as for the Slate project PPA.

“The inclusion of storage provides the agencies with a 100% clean and partially dispatchable product, allowing them to mitigate the ‘duck curve’ risk and monetise price spikes,” EDF Renewables product development director for renewables and energy storage Valeri Barros said.

Already a prolific adopter of solar and other distributed energy resources and technologies including electric vehicles (EVs), California now has in place a target to meet 100% of retail electricity sales with renewable sources by 2045.

Read Next

June 3, 2026
NTPC Green Energy is tendering EPC contracts to develop 3,300MWh of battery storage at Khavda hybrid renewable energy park in Gujarat, India.
June 2, 2026
Solar PV solutions provider Nextpower has entered into a definitive agreement to acquire BESS system integrator Prevalon Energy for up to US$365 million.
June 1, 2026
Mexico’s Ministry of Energy (SENER) has launched a new call for renewable power projects including generating and energy storage assets.
May 28, 2026
IPP ContourGlobal has put a solar-plus-storage project in Chile with a 6.5-hour BESS into commercial operation in Chile.
May 27, 2026
The California Energy Commission (CEC) has approved a 400MW/3,200MWh grid-scale battery storage project through the state planning agency’s Opt-In Certification Program.