New Mexico targets 7GWh of new energy storage by 2034

LinkedIn
Twitter
Reddit
Facebook
Email

The Senate of New Mexico has passed a bill, which will require investor-owned utilities to have 2GW/7GWh of energy storage online by 2034, the second such move by a US state this week.

The upper house of the State legislature passed Senate Bill 456 by 25 votes to 11 earlier this week (13 March). It will now go the House Energy, Environment and Natural Resources Committee (HENRC), part of the House of Representatives.

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

The Bill, which has an effective date of 1 July, 2023, entails amending the state’s Public Utility Act to include an energy storage deployment target.

Specifically, the Bill reads, the state will target 1,000MW/3,500MWh of energy storage deployments by December 31, 2028, and an additional identical amount by the same date in 2033, meaning a total of 2,000MW/7,000MWh online by 2034.

The figures have changed slightly from the first version of the bill, which mandated energy storage capacity targets of 4,000MWh and 8,000MWh for each date respectively. That means the average duration being targeted has gone from four hours – what the California ISO requires for projects to provide capacity through its Resource Adequacy framework – to 3.5 hours.

“The amount of energy storage capacity that an individual qualifying utility may be required to procure or deploy by the commission (New Mexico Public Regulation Commission), as part of the statewide energy storage target set forth in Subsection A of this section, shall be determined by the commission,” the Bill said.

The Bill’s stipulations around energy storage deployments apply to the state’s three investor-owned utilities, which serve 73% of the New Mexico population: Public Service Company of New Mexico (PNM), El Paso Electric (EPE) and Xcel Energy. They do not apply to smaller electric cooperatives regulated under the Rural Electric Cooperative Act.

It also provided a broad definition of energy storage which opens up the market to a range of technologies, defining it as: “…commercially available technology that is capable of retaining energy,
storing the energy for a period of time and delivering the energy after storage by chemical, thermal, mechanical or other means”.

Large-scale battery storage projects in the state so far have tended to be four-hour systems. PNM is planning to procure the energy from a co-located 150MW/600MWh project from DE Shaw Renewable Investments (DESRI), which was expected to come online last year although no announcement has been made. A year ago, technology firm Honeywell announced it would deploy a 20MW/80MWh lithium-ion battery storage project for a PNM solar farm.

The move by the New Mexico Senate follows hot on the heels from the lower house in Michigan proposing its own legal energy storage target, of 2.5GW of deployments by 2030.

See the Senate Bill 456 as it was passed this week in full below.

Energy-Storage.news’ publisher Solar Media will host the 5th Energy Storage Summit USA, 28-29 March 2023 in Austin, Texas. Featuring a packed programme of panels, presentations and fireside chats from industry leaders focusing on accelerating the market for energy storage across the country. For more information, go to the website. Reporter Cameron Murray will be attending both days.

18 March 2025
Sydney, Australia
As we move into 2025, Australia is seeing real movement in emerging as a global ‘green’ superpower, with energy storage at the heart of this. This Summit will explore in-depth the ‘exponential growth of a unique market’, providing a meeting place for investors and developers’ appetite to do business. The second edition will shine a greater spotlight on behind-the-meter developments, with the distribution network being responsible for a large capacity of total energy storage in Australia. Understanding connection issues, the urgency of transitioning to net zero, optimal financial structures, and the industry developments in 2025 and beyond.
26 March 2025
Austin, Texas
The Energy Storage Summit USA is the only place where you are guaranteed to meet all the most important investors, developers, IPPs, RTOs and ISOs, policymakers, utilities, energy buyers, service providers, consultancies and technology providers in one room, to ensure that your deals get done as efficiently as possible. Book your ticket today to join us in 2025!

Read Next

Premium
January 21, 2025
D. E. Shaw Renewable Investments is seeking a loan from the North American Development Bank (NADBank) towards the construction of a 150MW hybrid solar and BESS project in Doña Ana County, New Mexico.
January 17, 2025
New Mexico, US utility Kit Carson Electric Cooperative (KCEC) has received US$231 million from the US Department of Agriculture (USDA) to build hydrogen and solar facilities with long-duration energy storage (LDES).
January 17, 2025
System integrator Powin contributes to the latest of our Year in Review series, after a year in which it expanded into Europe and launched a new BESS product.
Premium
January 10, 2025
System operator ISO New England has given the go-ahead for a 300MW/1,200MWh BESS located in Boston, Massachusetts under development by Boulder, Colorado-based developer and IPP Flatiron Energy. 
January 9, 2025
The US Department of Energy (DOE) Loan Programs Office (LPO) has made a conditional commitment for a loan to utility Arizona Public Service (APS), the first part of which would go towards a 600MWh BESS.

Most Popular

Email Newsletter