Developer Boralex and its partner Walpole Island First Nation have announced a CA$172 million (US$119 million) financing for the 80MW/320MWh Tilbury battery energy storage system (BESS).
Energy Storage Award 2024 winner, Semih Oztreves, head of network infrastructure at BESS developer-investor Zenobē Energy, takes part in our annual Q&A series.
Chinese multinational renewable energy solutions provider Envision Energy will supply a 320MWh battery energy storage system (BESS) to Juniper Green Energy in India.
A roundup of energy storage news from across the continent of Africa, with Morocco’s ONEE shortlisting bidders for a pumped hydro project, Somalia launching a grid-scale solar and storage tender, and a microgrid pairing grid-scale solar, BESS and diesel at a mine in Zambia.
The US Department of Energy’s (DOE) Loan Programs Office (LPO) has made a conditional commitment for a loan to long-duration energy storage (LDES) developer and operator Hydrostor of up to US$1.76 billion.
System operator ISO New England has given the go-ahead for a 300MW/1,200MWh BESS located in Boston, Massachusetts under development by Boulder, Colorado-based developer and IPP Flatiron Energy.
Utility Eneco will optimise a BESS project in the Netherlands that, at 31.6MW/126.4MWh, will be the country’s largest when it comes online before the end of the year.