EPC DEPCOM building Puerto Rico solar-plus-storage plant with 51MW BESS

By Jonathan Touriño Jacobo
December 5, 2023
LinkedIn
Twitter
Reddit
Facebook
Email

DEPCOM Power, a provider of engineering, procurement and construction (EPC) work, is midway through construction on what it has called Puerto Rico’s “largest” solar-plus-storage project.

Located in Salinas, the Ciro One project is expected to begin operations at the end of 2024. It will have a capacity of 90MW for solar PV and a battery energy storage system (BESS) with an output of 51.5MW, which integrates a lithium-titanate oxide (LTO) battery. Once operational, the EPC firm will also operate and maintain the solar-plus-storage plant for five years.

The PV system has been designed to withstand hurricane-force winds – which Puerto Rico is prone to experience, and was severely hit by hurricanes Irma and Maria in 2017 – with a lower panel tilt angle and east/west orientation, while inverters include salt fog filters to mitigate effects of salinity on the system’s power electronics. The plant is built alongside developer Ciro Energy Group and local subcontractor Lord Construction.

Utility-scale projects in Puerto Rico are scarce due to the limited land available on the island, while its residential market is much more developed. This was fast-tracked after the territory was hit by hurricanes Irma and Maria, which put the island in a total blackout. These unfortunate events boosted interest in and consciousness of solar-plus-storage on the island’s residential market, as covered in a recent PV Tech Premium article.

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

Not ready to commit yet?
  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

To read the full version of this story, visit PV Tech.

DEPCOM VP of energy storage business development Greg Weyl recently spoke to Energy-Storage.news about the company’s combined EPC and operations and maintenance (O&M) role at a 200MW/800MWh battery energy storage system (BESS) for Arizona utility Tucson Electric Power.

Energy-Storage.news’ publisher Solar Media will host the 6th Energy Storage Summit USA, 19-20 March 2024 in Austin, Texas. Featuring a packed programme of panels, presentations and fireside chats from industry leaders focusing on accelerating the market for energy storage across the country. For more information, go to the website.

Read Next

November 5, 2025
Utility Osaka Gas and developer Sonnedix are installing what is claimed to be the largest battery storage facility co-located with renewable energy generation in Japan so far.
Premium
November 5, 2025
ESN Premium speaks with Neha Sinha of Wärtsilä Energy Storage, about DC-coupled solar-battery hybrids in Australia.
November 3, 2025
The Victoria government in Australia has approved a 300MW/1,200MWh BESS in Gippsland and a 332MW solar PV power plant with integrated storage in the state’s northeast region.
November 3, 2025
Battery storage capacity in Australia’s National Electricity Market (NEM) expanded by 2,936MW/6,482MWh over the 12 months leading to the end of Q3 2025.
Premium
October 31, 2025
Two investor-owned utilities (IOUs) are seeking regulatory approval to acquire an under-development solar and storage project located in Waushara County, Wisconsin. 

Most Popular

Email Newsletter