EPC DEPCOM building Puerto Rico solar-plus-storage plant with 51MW BESS

By Jonathan Touriño Jacobo
LinkedIn
Twitter
Reddit
Facebook
Email

DEPCOM Power, a provider of engineering, procurement and construction (EPC) work, is midway through construction on what it has called Puerto Rico’s “largest” solar-plus-storage project.

Located in Salinas, the Ciro One project is expected to begin operations at the end of 2024. It will have a capacity of 90MW for solar PV and a battery energy storage system (BESS) with an output of 51.5MW, which integrates a lithium-titanate oxide (LTO) battery. Once operational, the EPC firm will also operate and maintain the solar-plus-storage plant for five years.

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

The PV system has been designed to withstand hurricane-force winds – which Puerto Rico is prone to experience, and was severely hit by hurricanes Irma and Maria in 2017 – with a lower panel tilt angle and east/west orientation, while inverters include salt fog filters to mitigate effects of salinity on the system’s power electronics. The plant is built alongside developer Ciro Energy Group and local subcontractor Lord Construction.

Utility-scale projects in Puerto Rico are scarce due to the limited land available on the island, while its residential market is much more developed. This was fast-tracked after the territory was hit by hurricanes Irma and Maria, which put the island in a total blackout. These unfortunate events boosted interest in and consciousness of solar-plus-storage on the island’s residential market, as covered in a recent PV Tech Premium article.

To read the full version of this story, visit PV Tech.

DEPCOM VP of energy storage business development Greg Weyl recently spoke to Energy-Storage.news about the company’s combined EPC and operations and maintenance (O&M) role at a 200MW/800MWh battery energy storage system (BESS) for Arizona utility Tucson Electric Power.

Energy-Storage.news’ publisher Solar Media will host the 6th Energy Storage Summit USA, 19-20 March 2024 in Austin, Texas. Featuring a packed programme of panels, presentations and fireside chats from industry leaders focusing on accelerating the market for energy storage across the country. For more information, go to the website.

14 October 2025
InterContinental, Santiago, Chile
We are excited to bring the industry together for the fourth edition of the Energy Storage Summit Latin America on 14-15 October in Santiago, Chile. The Summit has become a meeting place for IPPs and developers, investors, financiers and banks, utilities, consultancies, software providers, and manufacturers who are setting high standards in the Latin American energy storage sector.

Read Next

July 18, 2025
Acciona Energía has submitted plans for a wind-plus-storage site featuring up to 800MWh of BESS to Australia’s EPBC Act.
July 17, 2025
D.E. Shaw Renewable Investments (DESRI) has started construction at a 150MW solar-plus-storage project in the US state of New Mexico, the BESS for which will be manufactured in the US by LG Energy Solution.
July 17, 2025
Contemporary Amperex Technology Ltd (CATL) has signed a framework supply agreement for a project to export renewable energy from Indonesia to Singapore.
July 15, 2025
AMEA Power has completed commissioning of the first large-scale battery energy storage system (BESS) in Egypt, ahead of the start of commercial operations.
July 10, 2025
Indonesia’s national Consumer Protection Agency (BKPN) will coordinate at least US$1 billion in investment for off-grid solar-plus-storage.

Most Popular

Email Newsletter