Bulgaria’s NEK deploying BESS at hydropower plants

LinkedIn
Twitter
Reddit
Facebook
Email

State-owned utility and power generation firm NEK is deploying BESS at its hydropower plants across Bulgaria.

The National Electricity Company (NEK) is moving to upgrade five hydropower plants with battery energy storage system (BESS) technology according to local reports, partially confirmed by announcements on NEK’s website.

The company aims to add a 10MWh BESS unit to its new Vacha 1 hydropower plant by the end of 2025 and has launched a call to do the same at four others. Those four have a total expense cited by reports of €63.2 million (US$65 million).

On 20 January, NEK announced four separate notification of investment intentions for energy storage systems, in the towns of Boynik, Aleko Konstantinov, Muhovo and Devin in the Kardzhali, Pazardzhik, Sofia and Smolyan regions respectively. Those locations are in the south and west of Bulgaria.

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

Not ready to commit yet?
  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

The announcements didn’t give more information than that, but local reports said the four additional BESS units will total ‘at least’ 279MWh.

The reports indicate the hydropower plants are run-of-river, while NEK also has substantial pumped hydro energy storage (PHES) plants both operating and in construction across Bulgaria.

The BESS will help to optimise the production of the five hydropower plants, and will be deployed with configurations of between two and three hours and capable of at least 6,000 cycles. The four additional hydropower plants to have co-located BESS are Studen Kladenets, Aleko, Devin and Topolnitsa, the reports add.

Bulgaria was in the headlines late last year after a 3GWh standalone energy storage tender, funded by the EU’s Recovery and Resilience programme, was oversubscribed by a factor of four.

The largest grid-scale BESS projects online that Energy-Storage.news has reported on are a 55MWh project by independent power producer (IPP) Renalfa and a 17.8MWh commissioned by China-based energy storage technology firm Sermatec for an unnamed owner.

2 December 2025
NH Collection Vittorio Veneto, Rome, Italy
Across two packed days, the Summit focused on three core themes: revenue & trading, the lifecycle of the battery, and optimisation tools. Attendees explored innovative strategies for enhancing asset performance and longevity, with a spotlight on key markets like Germany, Italy, and the UK. Stay tuned for details on the 2025 edition of the Battery Asset Management Summit Europe, where we’ll continue to chart the path forward for energy storage asset management.
24 February 2026
InterContinental London - The O2, London, UK
This isn’t just another summit – it’s our biggest and most exhilarating Summit yet! Picture this: immersive workshop spaces where ideas come to life, dedicated industry working groups igniting innovation, live podcasts sparking lively discussions, hard-hitting keynotes that will leave you inspired, and an abundance of networking opportunities that will take your connections to new heights!

Read Next

October 6, 2025
Asset manager AIP Management has bought a 49% stake in a 2.4GWh UK portfolio from global BESS investment platform BW ESS for a deal in excess of £650 million (US$873 million).
October 3, 2025
BESS provider Sungrow and power firm Engie have connected the first phase of a 400MW/800MWh project, one of the largest in Europe, to the grid in Belgium.
Premium
October 2, 2025
Investor-owned utility (IOU) Southwestern Public Service Company (SPS) is seeking approval from the New Mexico Public Regulation Commission (NMPRC) to construct a new eight-project portfolio of self-build energy assets.
October 2, 2025
The TSO of Italy has completed its first MACSE auctions for energy storage, procuring 10GWh of capacity at what the NHOA CEO called ‘exceptionally competitive prices’.
October 1, 2025
Power firm VPI has signed a 700MW pipeline BESS joint venture in Germany with developer Noveria Energy, while system integrator ADS-TEC has revealed a 1GW/2GWh project.

Most Popular

Email Newsletter