Australian transmission operator Transgrid has opened a pathway for 900MW of grid-forming inverter-equipped battery storage to contribute to New South Wales’ minimum system strength requirements.
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed