ABB installs solar-storage microgrid at its Gujarat manufacturing facility

LinkedIn
Twitter
Reddit
Facebook
Email
The manufacturing hub is the company’s largest facility in India, with over 3,000 employees. Credit: ABB

Technology provider ABB has inaugurated a microgrid solution at its Vadodora manufacturing facility in Gujarat, India.

The microgrid is said to be the first of its kind to be installed at a manufacturing campus in India using both solar PV and battery energy storage. The technology combination will support the factory’s productivity and enable green power supplies in the evening hours or during cloudy periods during the day.

The manufacturing hub is the company’s largest facility in India, with over 3,000 employees, producing transformers, high voltage products, distribution relays, motors, generators and turbochargers for a variety of national projects and beyond.

ABB’s Ability control and automation system, will serve the microgrid and ensure the optimal use of the renewable energy. A cloud-based remote service system will be deployed for the operations and maintenance of the microgrid.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

“Reliable, resilient and cost-effective power supply through microgrids is key to achieve Make in India targets, speed up industrial development and realize the vision of 24×7 power for all,” said Sanjeev Sharma, managing director, ABB India. “At a time when renewable energy, electric propulsion and digital technologies are disrupting the market, we are proud to partner our nation’s Skill India program through ABB PowerTEC to train the workforce of the future.”

Energy-Storage.News has reported on two other ABB microgrids in recent weeks, one which includes a 30MW battery system at Alinta Energy’s Newman Power Station in Pilbara, Western Australia, at a natural gas-fired facility, was announced as completed in mid-April and another, a fully-contained microgrid project for Jamaica Public Service Company (JPS), is just getting underway.

Additional reporting by Andy Colthorpe

Read Next

November 11, 2026
Envision Energy will supply its Gen 8 BESS platform for ju:niz Energy’s 442MWh Smareg 13 project in Bavaria, Germany.
November 11, 2026
The Western Australian (WA) government has awarded AU$15 million for a relocatable vanadium electrolyte manufacturing facility.
Premium
November 10, 2026
The energy storage industry is abuzz with discussion of passing BAAJA following Democrats’ taking of the House and Senate in the 2026 US midterm elections.
November 10, 2026
Alectra Energy Solutions and Convergent Energy & Power have completed a 320MWh BESS portfolio at three sites in Ontario.
November 10, 2026
Battery energy storage system (BESS) projects in Japan by Sumitomo Corporation and Greenvolt provide an interesting snapshot of the country’s development landscape.