Construction kicks off on 400MWh Merredin Big Battery in Western Australia

LinkedIn
Twitter
Reddit
Facebook
Email

Construction has officially started on the 100MW/400MWh 4-hour duration Merredin battery energy storage system (BESS) in Western Australia.

The Meredin Big Battery is being pursued via a partnership between Atmos Renewables and Nomad Energy. It is set to be built adjacent to the 132MW Merredin solar PV power plant being developed by Risen Energy.

The project developers achieved financial close on the BESS in early July 2025, and is Atmos Renewables’ first greenfield development to enter the construction phase.

The battery storage project, located approximately 7.5km southwest of Merredin, along the 650km Muja to Kalgoorlie 220kV transmission line, is expected to be commissioned in October 2026.

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

It will be connected to the South West Interconnected System (SWIS), the main electricity grid for the southwest of the state, including the capital, Perth, and operate in the Wholesale Electricity Market (WEM), the primary market for generators and retailers in the state.

Construction company, GenusPlus Group, was awarded a contract to build the 400MWh Merredin BESS in June.

Renewable energy developer Nomad Energy first identified the potential for the Merredin BESS in 2022, with close proximity to key energy infrastructure in the state. Nomad partnered with Atmos Renewables to support the development of the BESS.

As reported by Energy-Storage.news earlier this year, the Merredin BESS was one of the projects successful in Western Australia’s first Capacity Investment Scheme (CIS) tender, which was announced in March.

Amber-Jade Sanderson, the Western Australia minister for energy and decarbonisation, hailed the project, stating that it will add to the state’s “energy armoury” and help stabilise Western Australia’s electricity grid.

“The Merredin Big Battery will add to our energy armoury, which includes state-owned batteries in Kwinana and Collie, and the Neoen battery also in Collie,” Sanderson said.

“Together with new transmission lines, wind, solar, and gas generation where needed, they are important elements of the energy grid of the future.”

It is worth noting that the Merredin BESS developers have established a voluntary community benefit fund to provide financial support for community-based initiatives, projects and events.

Once operational, AU$20,000 (US$12,950) a year will be available through the Merredin Battery Community Legacy Fund, continuing over the project’s estimated 25-year life.

Our publisher, Solar Media, will host the Battery Asset Management Summit Australia 2025 on 26-27 August in Sydney. You can get 20% off your ticket using the code ESN20 at checkout.

11 November 2025
San Diego, USA
The 2024 Summit included innovative new features including a ‘Crash Course in Battery Asset Management’, Ask-Me-Anything formats and debate-style sessions. You can expect to meet and network with all the key industry players again in 2025 from major US asset owners, operators, RTOs and ISOs, optimizers, software and analytics providers, technical consultancies, O&M technology providers and more.
24 February 2026
InterContinental London - The O2, London, UK
This isn’t just another summit – it’s our biggest and most exhilarating Summit yet! Picture this: immersive workshop spaces where ideas come to life, dedicated industry working groups igniting innovation, live podcasts sparking lively discussions, hard-hitting keynotes that will leave you inspired, and an abundance of networking opportunities that will take your connections to new heights!

Read Next

August 8, 2025
Utility Portland General Electric (PGE) announced the completion of three battery energy storage systems (BESS) totalling more than 1.9GWh in Portland, Oregon, US.
August 8, 2025
Ampyr Australia has officially started construction on its 300MW/600MWh Wellington Stage 1 BESS in New South Wales.
August 8, 2025
Australian energy major AGL Energy has confirmed that two transformers for the 1,000MWh Liddell battery energy storage system (BESS) in New South Wales have been delivered.
August 7, 2025
Energy storage developer and system integrator Energy Vault has received approval to pursue market-based participation in the California Independent System Operator (CAISO) with the Calistoga Resiliency Centre (CRC).
August 7, 2025
Calibrant, a joint venture between Green Investment Group and German engineering company Siemens, has energised and begun generating Value of Distributed Energy Resources (VDER) credits from three front-of-the-meter battery energy storage systems (BESS) in New York, US.

Most Popular

Email Newsletter