591MW of battery storage receives grid connection offers in Ireland alongside 1.5GW of solar PV

By Alice Grundy
November 24, 2021
LinkedIn
Twitter
Reddit
Facebook
Email
Statkraft’s 26MW Kelwin 2 battery storage site in County Kerry, Republic of Ireland, which was completed earlier this year and shares a grid connection with a wind farm. Image: Statkraft.

Transmission system operator Eirgrid and grid maintenance and construction group ESB Networks have released the full list of renewable energy projects to receive grid connection offers in Ireland through their enduring connection policy (ECP) process, with solar PV representing the majority of these.

In total, 85 projects – representing 2,897MW – are due to receive connection offers under Category A of ECP 2.2, with the second stage of the ECP (ECP 2) being split into three batches of connection offers (ECP 2.1, ECP 2.2 and ECP 2.3).

Of these, 61 are solar PV with a collective capacity of 1,533MW. There are also two battery storage projects with a collective capacity of 150MW, and 6 hybrid solar-plus-storage sites consisting of 325MW of solar and 441MW of battery storage.

This includes a 185MW hybrid solar-plus-storage site in Louth under development from Strategic Power Projects. The Monvallet project is split into 50MW of PV and 135MW of battery storage, with the storage element to provide system services and security of supply to the grid.

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

Not ready to commit yet?
  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

To read the full version of this story visit Solar Power Portal.

24 February 2026
InterContinental London - The O2, London, UK
This isn’t just another summit – it’s our biggest and most exhilarating Summit yet! Picture this: immersive workshop spaces where ideas come to life, dedicated industry working groups igniting innovation, live podcasts sparking lively discussions, hard-hitting keynotes that will leave you inspired, and an abundance of networking opportunities that will take your connections to new heights!

Read Next

November 19, 2025
Solar Energy Corporation of India (SECI) has agreed on BESS and hybrid solar developments with the Government of Andhra Pradesh.
November 18, 2025
US residential solar and energy storage installer Sunrun has posted revenue of US$724.6 million in the third quarter of this year, as the company implements its “storage-first strategy”.
November 18, 2025
New wholesale electricity market rules have been introduced in Ireland, designed to allow battery storage assets to participate directly.
Premium
November 14, 2025
The US development arm of Milan, Italy-headquartered developer Nadara has encountered a setback in its pursuit of a 200MW hybrid BESS destined for Arizona.
November 14, 2025
State-backed power firm PPC Renewables has launched construction on its a large-scale BESS in Greece, for which Trina Storage will supply the energy storage technology.